Oveliance Agefos

8058
Last modified by the author on 19/05/2017 - 11:17

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2016
  • Address 1 - street : Rue Pierre-Gilles de Genne 69007 LYON, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 1 876 m2
  • Construction/refurbishment cost : 2 698 000 €
  • Number of Work station : 180 Work station
  • Cost/m2 : 1438.17 €/m2

Certifications :

  • Primary energy need
    85.1 kWhep/m2.an
    (Calculation method : RT 2012 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

Oveliance is a 1795 square meter office design that is designed to promote sharing and communication with many places of conviviality imagined inside the trays and on the floor levels. This project was carried out by Novélige, a subsidiary of VINCI Construction France.

Sustainable development approach of the project owner

"At VINCI, we believe that there is no economic success without a human project. This is rooted in our culture. We are also convinced that our social, societal and environmental performance is an asset for our development, as it is an increasing expectation of our clients and international investors. That is why we published our Manifesto in 2012, in which we make eight intangible and universal commitments. It is a common framework that all VINCI entities must appropriate according to their businesses and markets. I personally oversee the mobilization of all Group managers. " Xavier Huillard Commitment N ° 3 - Together for Green Growth! We participate in the prospective reflection on the city and sustainable mobility. Our innovations, resulting from eco-design, enable us to improve the energy and environmental performance of our infrastructures. We are committed to reducing our greenhouse gas emissions by 30% by 2020, supporting our customers in their search for better energy efficiency and encouraging them to adopt eco-responsible behavior. Each project is imagined by ensuring its integration into its environment, as well as the quality of the living environment it offers. VINCI Construction France created Blue Fabric, its vision to build responsibly, and thus meet the four challenges of the sustainable city. Competitiveness: to give the city seductive assets, by building buildings and equipment with high functionality, economically efficient, sustainable, accessible, affordable, with loads optimized. Creativity: to accompany the designers and their vision, by providing them with innovative solutions and proven techniques. Conviviality: reflect on the scale of the neighborhood and the diversity of its activities, mixing housing, offices, shops and attractive public spaces to promote the meeting. Consensus: working collaboratively and transparently with all project stakeholders - investors, customers, architects, public authorities, network managers - but also local residents and associations.

Architectural description

Designed to promote sharing and communication with convivial spaces inside the trays and on the landing, it comprises on the ground floor, a large modular meeting room adjoining the luminous reception area. The two floors, served by a glazed elevator, let the natural light shine through. To improve this feeling of comfort, an interior architect intervened to distill a few touches of color and promote the circulation of employees inside the building.

Stakeholders



    Thermal consultancy agency

    Industherm

    Geraud BULLY

Energy consumption

  • 85,10 kWhep/m2.an
  • 110,00 kWhep/m2.an
  • RT 2012

Systems

    • Heat pump
    • Other hot water system
    • Reversible heat pump
    • Double flow heat exchanger
    • Heat pump

Urban environment

    Ovéliance AGEFOS is located in an industrial area close to public transport.

Product

    CLAD Cladding

    Neolife

    304, RN6-Celtic Parc Bâtiment Avalon II, 69760 Limonest ; [email protected]

     https://www.neolife-solutions.com

    Table 'c21_germany.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '6'

    The wood cladding is reconstituted by a minimum of 90% of wood fibers with a clear-track appearance and blades that can be combined with waves of 4 or 14 centimeters. Their fixings are made on wooden bedding, the installation is fast and adjusted.


    DECK Platform

    NEOLIFE

    304, RN6-Celtic Parc Bâtiment Avalon II, 69760 Limonest ; [email protected]

     https://www.neolife-solutions.com

    Table 'c21_germany.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '16'

    The wood decking consists of a minimum of 82% of wood fibers with 30 centimeter wide, solid or alveolar blades. The fixing can be done on any support with possibility of unit disassembly of the blades without damage. Dimensional stability allows reduced expansion joints. The decking is rot-proof, there is no development of foams or molds.

GHG emissions

  • 3,47 KgCO2/m2/an
  • Calculation RT2012

  • 0,20 KgCO2 /m2
  • 50,00 année(s)
  • 700,00 KgCO2 /m2
  • Calculation BBCA Elodie

Building candidate in the category

Bas Carbone

Bas Carbone

Coup de Cœur des Internautes

Coup de Cœur des Internautes

Green Solutions Awards 2017 - Bâtiments
PDF

Share :
Author of the page

Nathalie MEHU


Other case studies

More

Contest

Green Solutions Awards 2017 - Bâtiments