Sindibad Beach Resort - T1A and T1B

  • Project type : New Construction
  • Building Type : Collective housing > 50m
  • Construction Year : 2014
  • Delivery year : 2017
  • Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
  • Net Floor Area : 52 460 m2
  • Construction/refurbishment cost : 24 000 000 €
  • Number of Dwelling : 258 Dwelling


Moderated by : Sylvain Bosquet

Similar case studies

Forest in the Sky

Developed by Flamingo Dai Lai Joint Stock Company, Forest in the Sky is a unique real estate project with advanced green technologies located in Hanoi. Vietnam’s Coteccons served as the construction contractor for the eco-friendly (...)

Ecolife Capitol

Ecolife Capitol’s three high-rise residential towers introduced over 630 green apartments to the housing market in Ha Noi, Vietnam. To maximize energy savings and ensure occupant comfort, each of the apartments in the development are (...)

Villa Flora

Developed by Chabuma S.A./Central Home Consortium, a local Haitian developer, Villa Flora is a residential estate located in the heart of Port-au-Prince. The development targets the needs of the city’s emerging middle class by offerin (...)


  • Published on 10 June 18
    by Zakaria SADIK|Maroc
    Viewed 3396 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Health & Comfort
    Users' Choice
    Sustainable Construction Grand Prize


    The environmental features of the project include: double brick wall envelope with insulation and air gap, thermal solar panels for the ECS (villas and duplex), bioclimatic approach with privileged West orientation, minimizing South orientation and incorporating breezes sliding sunscreens for sun protection, through flats to optimize natural ventilation, distribution of masses built around vegetated surfaces, facades in light colors.


    Certification Scheme


    Location

    Rond point Boulevard Abdelhadi Boutaleb et Boulevard Sidi Abderrahmane، R320 , 20000 Casablanca Maroc

    Technicals Features