LEP - Social Housing for Positive Energy

  • Project type : New Construction
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2015
  • Delivery year : 2015
  • Climate zone : [BSh] Subtropical Dry Semiarid (Steppe)
  • Net Floor Area : 55 m2
  • Construction/refurbishment cost : 22 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 400 €/m2
  • Cost/Dwelling : 22 000 €/Dwelling


Moderated by : User

Similar case studies

Perlita Passive house

The goal of the Perlita Project is to show a new path for low energy consumption buildings in Los Angeles and in Southern California through realistic, affordable and reproducible solutions.The main focus was the energy efficiency (...)

North Beach Project

This truly indulgent 4 x 3 two-storey home is a modern design built to the world leading passive standards but crosses the boundary to where affordability and sustainability come together.This fabulous home is the only one of its kind (...)

Sustainable Passive House Fontana

A Passivhaus construction in central Italy, a temperate zone categorized as having cold winters and hot summers, that provides energy savings and reduces environmental footprint in a region where the technological requirements are


  • Published on 22 May 16
    by Ahmed Belamine|Maroc
    Viewed 15938 times


  • Contest

    Green Building Solutions Awards 2016

    Energy & Hot Climates
    Smart building
    Users' Choice Award




    Location

    Ecole Mohammed VI de Formation aux Métiers du Bâtiment et des Travaux Publics de l'OFPPT , 26000 Settat Maroc

    Technicals Features