SOLARWIND

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2009
  • Delivery year : 2011
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 11 450 m2
  • Construction/refurbishment cost : 18 500 000 €
  • Number of Work station : 800 Work station
  • Cost/m2 : 1 616 €/m2
  • Cost/Work station : 23 125 €/Work station


Moderated by : Violaine Giaux

Similar case studies

ADEMI-DF

​An office building, designed for ADEMI-DF's new headquarters (Association of Real Estate Market Companies of Brazil Federal District). ADEMI-DF was opened on december 2015. This project, with sustainable solutions, has 733m2 of built (...)

Kuggen. Ecopilot, energenious building automation system

​KabonaABKabona is a company which works with energenious energy building automation and the company’s head office is locatedin Borås, Sweden. Kabona was founded in 2001 and has long-standing and solidexperience, which has formed the (...)

Brock Environmental Center

The Brock Environmental Center is certified to the Living Building Challenge (LBC) and Leadership in Energy and Environmental Design (LEED) Platinum. The center is designed to be energy positive and zero water, and resilient to the (...)


Testimonials


Comments


  • Published on 26 August 14
    by Guy Wagner|Luxembourg
    Viewed 8048 times


  • Contest

    Green Building Solutions Awards 2015

    Renewable energies
    Health & Comfort


    ​If we selected the "Renewable Energies" and "Health & Comfort" categories, then this was because we placed particular emphasis on both these aspects when designing, creating and developing Solarwind.

    Moreover, in addition to the envelope having high-energy performance, the client wanted to diversify the energy supply sources and favour renewable energies. In so doing, the client wanted to showcase innovative technologies to visitors which they can apply and demonstrate how these technologies complement each other:

    - geothermics

    - biomass (wood pellet boiler / miscanthus)

    - earth-to-air heat exchanger

    - geothermal cooling

    - adiabatic cooling on rainwater for the CTA

    - solar thermal energy

    - solar photovoltaic energy

    - urban wind turbines

    As for the health and well-being of those using the building, being the company occupying the block, PROgroup want to promote the well-being of its staff, on the one hand by organising "brainstorming" sessions to ascertain its employees’ needs and wishes and on the other hand by very carefully selecting materials and technical solutions that would guarantee optimal interior air quality and high summer/winter hygrothermal comfort.

    This aspect was brought into focus during the triple DGNB/BREEAM/HQE certification process, in particular by achieving HQE "Exceptional" certification level during the building phase and DGNB "Gold".

    Furthermore, the requirements with regard to rental arrangements were set down in a contract so as to guarantee energy, acoustic and sanitary performance while the site is being operated.