SOLARWIND

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2009
  • Delivery year : 2011
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 11 450 m2
  • Construction/refurbishment cost : 18 500 000 €
  • Number of Work station : 800 Work station
  • Cost/m2 : 1 616 €/m2
  • Cost/Work station : 23 125 €/Work station


Moderated by : Violaine Giaux

Similar case studies

Green Lighthouse

​Green Lighthouse is Denmark’s first public carbon-neutral building. The building has been built in less than a year in a close public/private partnership.Green Lighthouse is an energy-efficient building of great architectural merit (...)

6 Pancras Square

​BNP Paribas Real Estate presents 6 Pancras Square next to Saint Pancras station. The building was designed by Jean-Michel Wilmotte and will be developed by BNP Paribas Real Estate Property Development UK.The project comprises of offi (...)

Mohammed bin Rashid Space Centre

​Baptized "UAE's first sustainable autonomous house", this new office building in Dubai, was realized in 2016 as a pioneering “pilot project” for MBRSC, a governmental research body. It is the first one to obtain the certification (...)


Testimonials


Comments


  • Published on 26 August 14
    by Guy Wagner|Luxembourg
    Viewed 7435 times


  • Contest

    Green Building Solutions Awards 2015

    Renewable energies
    Health & Comfort


    ​If we selected the "Renewable Energies" and "Health & Comfort" categories, then this was because we placed particular emphasis on both these aspects when designing, creating and developing Solarwind.

    Moreover, in addition to the envelope having high-energy performance, the client wanted to diversify the energy supply sources and favour renewable energies. In so doing, the client wanted to showcase innovative technologies to visitors which they can apply and demonstrate how these technologies complement each other:

    - geothermics

    - biomass (wood pellet boiler / miscanthus)

    - earth-to-air heat exchanger

    - geothermal cooling

    - adiabatic cooling on rainwater for the CTA

    - solar thermal energy

    - solar photovoltaic energy

    - urban wind turbines

    As for the health and well-being of those using the building, being the company occupying the block, PROgroup want to promote the well-being of its staff, on the one hand by organising "brainstorming" sessions to ascertain its employees’ needs and wishes and on the other hand by very carefully selecting materials and technical solutions that would guarantee optimal interior air quality and high summer/winter hygrothermal comfort.

    This aspect was brought into focus during the triple DGNB/BREEAM/HQE certification process, in particular by achieving HQE "Exceptional" certification level during the building phase and DGNB "Gold".

    Furthermore, the requirements with regard to rental arrangements were set down in a contract so as to guarantee energy, acoustic and sanitary performance while the site is being operated.


    Certification Scheme


    Location

    , L-8399 Windhof (Koerich) Luxembourg

    Technicals Features