Office building Goblet Lavandier & Associés Ingénieurs-Conseils S.A.

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2017
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 3 m2
  • Construction/refurbishment cost : 6 000 000 €
  • Number of Work station : 160 Work station
  • Cost/m2 : 2 000 000 €/m2
  • Cost/Work station : 37 500 €/Work station


Moderated by : Alexia ROBIN

Similar case studies

6 Pancras Square

​BNP Paribas Real Estate presents 6 Pancras Square next to Saint Pancras station. The building was designed by Jean-Michel Wilmotte and will be developed by BNP Paribas Real Estate Property Development UK.The project comprises of offi (...)

Almelo City Hall

​As part of a larger plan to revitalise the city centre of Almelo, the newly built city hall is an example of sustainable construction and modern design. With sustainability as the cornerstone of its design, the building is currently (...)

China Academy of Building Research NZEBuilding

​The nearly zero energy building (NZEB) at the China Academy of Building Research (CABR) adhered to the design principle of "passive building, proactive optimization, economic and pragmatic". An ambitious annual energy consumption (...)


  • Published on 07 June 19
    by Elisabeth Krier|Luxembourg
    Viewed 811 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Health & Comfort
    Users' Choice


    Certification DGNB (German Sustainable Building Council) level platine(meilleure classification)

    Energy consumption efficiency. It is very important to us to limit the building's energy and resource consumption as much as possible, among other things by carefully choosing the lighting concept and the luminaires installed.

    The building is very well insulated and does not have a boiler, but a reversible heat pump, which heats and cools the building. In the centre of the building, a light shaft provides both natural light and a cooling well, provided by natural ni ght ventilation.

    The entire roof surface is covered with photovoltaic panels.

    Rainwater is collected on the roof and used for sanitary facilities and watering the surrounding area.

    The building is developed in the basement on three levels. There are about 100 parking spaces, some of which are equipped with charging stations for electric vehicles.

    A rigorous use of healthy construction materials;the result has been validated by measurements of air quality and control of the absence of polluting substances.

    The building has enabled GL&Ass to achieve certain principles that we defend and that weadvise our clients. An elaborate and exhaustive monitoring system allows the monitoring and control of energy consumption, with more than

    700 measuring points. This data is analyzed by the teams responsible for the operation of the building and will make it possible to optimize the building's energy consumption while ensuring the comfort and well-being of the employees, and the aim is to improve service to our customers through very concrete feedback.


    Certification Scheme


    Location

    53, rue Gabriel Lippmann , 6947 Niederanven Luxembourg

    Technicals Features