Avenir Residences

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2015
  • Delivery year : 2017
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 1 140 m2
  • Construction/refurbishment cost : 4 435 900 €
  • Number of Dwelling : 32 Dwelling
  • Cost/m2 : 3 891 €/m2
  • Cost/Dwelling : 138 622 €/Dwelling


Moderated by : Clément Gaillard

Similar case studies

Evocasa Selecta

Mixed use development comprising 77 apartaments spread from 2nd floor to 10th floor, offices on 1st floor and commercial spaces on ground floor. Regime of height 2B+GF+10F.

Accent Vert & Accent Eco

​The ACCENT VERT & ACCENT ECO project is located on the outskirts of Warsaw on a former agricultural land, in a neighbourhood that is today rapidly developing and will soon be just next to the new metro line.The buildings are located (...)

Flatmettoekomst - Utrecht (net zero-energy 'flat for the future')

Flatmettoekomst is a net zero energy retrofit of apartment buildings dated from the early sixties of last century. The project consist of 48 apartments. Currently an additional 80 apartments are retrofitted with the same concept.This (...)


  • Published on 18 June 19
    by Saël Gramdi|Luxembourg
    Viewed 595 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Low Carbon



    Certification Scheme


    Location

    70-72, Rue de l'avenir , L-1147 Luxembourg Luxembourg

    Technicals Features