Redevelopment of a residential building with hemp

  • Project type : Extension + refurbishment
  • Building Type : Terraced Individual housing
  • Construction Year : 2015
  • Delivery year : 2015
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 83 m2
  • Construction/refurbishment cost : 105 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 1 265 €/m2
  • Cost/Dwelling : 105 000 €/Dwelling


Moderated by : Sylvain Bosquet

Similar case studies

Troni Brien House in the mountains

Troni-Brien House is a single family project with particular clients which were looking to live in a Zero Energy House, therefore the right standard to design with was Passivhaus. In Chile, normal housing heating demands about 150 (...)

Passivistas:TheHouseProject

The existing building, a typical 1960´s Athens single-family house, was selected for a full refurbishment using Passivhaus standards. The bearing structure was originally made by reinforced concrete with no insulation in the walls (...)

Rehabilitation of the family pension "Le Lubidet"

The existing buildings meet an old industrial town with homes that were very outdated. The whole is transformed into a boarding house intended for the reception of people in social difficulty. The facades of housing redeveloped in (...)


  • Published on 25 July 15
    by Nicola Preti|Italia
    Viewed 8754 times
  • Proposed by :




  • Contest

    Green Building Solutions Awards 2016

    Energy & Temperate Climates
    Sustainable Renovation Grand Prize
    Users' Choice Award



    Certification Scheme


    Location

    Via Pomposa 30 , 37134 Verona Italia

    Technicals Features