Industrial building Bonatti irrigations
- by Nicola Preti
- /
- 2016-07-07 16:52:34
- /
- Italia
- /
- 10930 / IT
New Construction
- Building Type : Logistics warehouse
- Construction Year : 2010
- Delivery year : 2012
- Address 1 - street : 37060 VIA PAPA GIOVANNI PAOLO II, 8 - BUTTAPIETRA, Italia
- Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
- Net Floor Area : 3 000 m2
- Construction/refurbishment cost : 3 150 000 €
- Cost/m2 : 1050 €/m2
-
Primary energy need :
150 kWhpe/m2.anno
(Calculation method : UNI TS 11300 )
Industrial building working as a nearly energy building through passive construction system and active energy producer
See more details about this project
http://www.nicolapreti.it/#/fuori-dalle-righe/http://www.nicolapreti.it/#/fuori-dalle-righe/
Data reliability
Self-declared
Stakeholders
Designer
Nicola Preti, Fabio Faoro [email protected]Investor
Bonatti IrrigazioniStructures calculist
Ing. Davide CaianiConstruction company
Other consultancy agency
Ing. Alberto SpelliniContracting method
Lump-sum turnkey
Owner approach of sustainability
Sustainability is a continuous work of innovation. Each of my project is the experimentation of a new approach with technology. In this case the scope of the project and the objectives of the client were: - create a nearly zero energy building - create a natural interior atmosphere thanks to natural lighting - make the building work as a thermal mass.
Architectural description
Sustainability is a continuous work of innovation. Each of my project is the experimentation of a new approach with technology. In this case the scope of the project and the objectives of the client were: - create a nearly zero energy building - create a natural interior atmosphere thanks to natural lighting - make the building work as a thermal mass.
If you had to do it again?
I think the project had a good outcome due to the successful communication and collaboration between the stakeholders involved. The architecture the materials, and the energy choices were deeply discussed before the implementation. I wouldn't change anything.
Building users opinion
The users are the worker of the warehouse and the employees of the offices. They are both very satisfied with the thermal comfort inside the building, both in winter and in summer. In particular the employees of the office are satisfied with the temperature with a very low power heating system.
Product
-
Progress Thermowand

Double prefabricated concrete wall with internal insulation
The product had a great success between the stakeholders thanks to the thermal comfort and the very low cost of other heating systems.
-
Lexan Thermoclick

Polycarbonate panels used as screens for sunlight
Great acceptance thanks to the diffuse light it creates in the interior of the building.
Author of the page
Nicola Preti
Architetto libero professionista
Other case studies

Vortex (Switzerland)
- 16/01/2023
- /
- Yasmina Sandoz
- /
- 277

TherapieStützpunkt
- 07/04/2021
- /
- Sabrina Gassner
- /
- 7501

House Solaris 416
- 02/04/2021
- /
- Michaela Fink
- /
- 4911

Charter Telecom headquarters
- 02/04/2021
- /
- Sarah King
- /
- 6472

Kindertagesstätte Calarasi
- 02/04/2021
- /
- Construction21 Communication
- /
- 4463

Zetland Passive House
- 01/04/2021
- /
- Tiffany Chong
- /
- 6421