GALLERY HOUSE

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2012
  • Delivery year : 0
  • Climate zone : [BSh] Subtropical Dry Semiarid (Steppe)
  • Net Floor Area : 425 m2
  • Construction/refurbishment cost : 1 200 000 €
  • Number of Dwelling : 7 Dwelling
  • Cost/m2 : 2 824 €/m2
  • Cost/Dwelling : 171 429 €/Dwelling


Moderated by : Carlotta Berta

Similar case studies

7 low-energy ModCell homes

These 7 terraced homes located in Shirehamton, Bristol, UK, constitute the world’s first commercially available straw eco-homes, using the BM Trada Q Mark certified ModCell Core prefabricated straw bale panel system. As part of the (...)

Flatmettoekomst - Utrecht (net zero-energy 'flat for the future')

Flatmettoekomst is a net zero energy retrofit of apartment buildings dated from the early sixties of last century. The project consist of 48 apartments. Currently an additional 80 apartments are retrofitted with the same concept.This (...)

Evocasa Selecta

Mixed use development comprising 77 apartaments spread from 2nd floor to 10th floor, offices on 1st floor and commercial spaces on ground floor. Regime of height 2B+GF+10F.


  • Published on 21 February 13
    by gruppoforesta studio d'architettura|Italia
    Viewed 13491 times


  • Certification Scheme


    Location

    25 - VIA BERNARDINO BONIFACIO , 73100 LECCE Italia

    Technicals Features