Building EnergyPlus Orru

  • Project type : New Construction
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2010
  • Delivery year : 2010
  • Climate zone : [Dwa] Humid Continental Hot Summer, severe, dry winter
  • Net Floor Area : 170 m2
  • Construction/refurbishment cost : 310 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 0 €/m2
  • Cost/Dwelling : 0 €/Dwelling


Moderated by : La rédaction C21

Similar case studies

medano passivhaus

​first nzeb in the canary islands built with passivhaus standars. the house reuses water for irrigation. Isolations are made with light lime.

PASSIVE HOUSE CHE

The challenge was to create a simple,sustainable, two-storey unit that would fit into a special site: a matureforest inside  a northern Romanian city.<o:p></o:p>House Che subtly rises aroundthe inner courtyard in a mesmerizing natural environmen (...)

Lark Rise Passivhaus Plus house

Lark Rise, the first Passivhaus Plus building in the UK, was rigurously designed and built by Bere Architecs in 2015 to test the viability of the concept ‘house as power station’ in a north European climate and to establish the potent (...)


  • Published on 12 February 13
    by Paolo Orru|Italia
    Viewed 2150 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice



    Certification Scheme


    Location

    , 39028 Silandro Italia

    Technicals Features