Waste House

  • Project type : New Construction
  • Building Type : School, college, university
  • Construction Year : 2013
  • Delivery year : 2014
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 85 m2
  • Construction/refurbishment cost : 250 000 €
  • Number of Pupil : 25 Pupil
  • Cost/m2 : 2 941 €/m2
  • Cost/Pupil : 10 000 €/Pupil


Moderated by : Sylvain Bosquet

Similar case studies

RENOVATION OF THE SCHOOL GYM – MIDDLE SCHOOL “DANTE ALIGHIERI”

In the Mediterranean climate, through careful design based on sustainable bioclimatic study of the site, marked by the simple construction of the dry assembly, the project of renovation of an existing gymnasium obtains high performanc (...)

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)

Renovation of Paradis School

In Paris, 100 schools have been renovated in two years to improve their energy performance! This challenge, Optimal Solutions, subsidiary Dalkia (EDF Group) noted. The program is a major component of the energy and climate plan launch (...)


Testimonials


Comments


  • Published on 15 June 18
    by Duncan Baker-Brown|International
    Viewed 1168 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Low Carbon
    Users' Choice



    Certification Scheme


    Location

    58–67 Grand Parade , BN2 0JY Brighton United Kingdom

    Technicals Features