Waste House

  • Project type : New Construction
  • Building Type : School, college, university
  • Construction Year : 2013
  • Delivery year : 2014
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 85 m2
  • Construction/refurbishment cost : 250 000 €
  • Number of Pupil : 25 Pupil
  • Cost/m2 : 2 941 €/m2
  • Cost/Pupil : 10 000 €/Pupil


Moderated by : Sylvain Bosquet

Similar case studies

RENOVATION OF THE SCHOOL GYM – MIDDLE SCHOOL “DANTE ALIGHIERI”

In the Mediterranean climate, through careful design based on sustainable bioclimatic study of the site, marked by the simple construction of the dry assembly, the project of renovation of an existing gymnasium obtains high performanc (...)

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)

Groupe Scolaire Sainte Therese - Saint Joseph La Salle

First school in France Minergie labeled P, Swiss label requiring the Groupe Scolaire Saint Thérèse is composed of 13 classes (3 kindergartens and 10 elementary, extensible , 4 and 11), an entrance hall, a school care, a library, (...)


Testimonials


Comments


  • Published on 15 June 18
    by Duncan Baker-Brown|International
    Viewed 818 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Low Carbon
    Users' Choice



    Certification Scheme


    Location

    58–67 Grand Parade , BN2 0JY Brighton United Kingdom

    Technicals Features