Villa Flora

  • Project type : Renovation
  • Building Type : Collective housing > 50m
  • Construction Year : 2015
  • Delivery year : 2019
  • Climate zone : [Aw] Tropical Wet & Dry with dry winter.
  • Net Floor Area : 2 163 m2
  • Number of Dwelling : 39 Dwelling


Moderated by : Hassan ABOUZID

Similar case studies

EDIFICI ACONCAGUA

​​Reformed building with 27 apartments, applying energy efficiency criteria. It’s situatedin an alpine zone.The winter’s minimum temperature is -12°C.Reduced heating consumption by 82%.Acting on facade insulation and heating system (...)

HSB Living Lab

The HSB Living Lab (Gothenburg, Sweden) is a habitation infrastructure, in the form of student housing, that aims to be a co-creative social space for experimenting with sustainable technology and lifestyle in order to develop innovat (...)

LILAC: Low Impact Living Affordable Community

LILAC is the UK's first affordable, ecological cohousing project. A community of 20 households and common house, the buildings are made with the ModCell prefabricated straw bale construction system, assembled by LILAC members using (...)


  • Published on 07 June 19
    by Hassan ABOUZID|International
    Viewed 87 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates



    Certification Scheme


    Location

    26, Impasse Julie, Petion-Ville , HT 6140 Petion-Ville Other countries

    Technicals Features