The First ECO-SANDWICH House

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2016
  • Delivery year : 2016
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 393 m2
  • Construction/refurbishment cost : 313 661 €
  • Number of Dwelling : 3 Dwelling
  • Cost/m2 : 798 €/m2
  • Cost/Dwelling : 104 554 €/Dwelling


Moderated by : Vincent Gilfaut

Similar case studies

House on the Mountain

​The House on the Mountain was conceived as house for one family with three additional holiday apartments.It softly nestles against the slope and it’s size, roof shape and materials are inspired by the traditional „Wälderhaus“. The (...)

Evocasa Selecta

Mixed use development comprising 77 apartaments spread from 2nd floor to 10th floor, offices on 1st floor and commercial spaces on ground floor. Regime of height 2B+GF+10F.

Passivhaus via Napoleone Bonaparte in Putignano

​Project:A low-cost Passivhaus in southern Italy was chosen as a sample project to test a compact solution for heating, cooling, DHW and mechanical ventilation. An integrated design approach made possible a cost-effective building (...)


Testimonials


Comments


  • Published on 10 June 17
    by Mark Miscevic|International
    Viewed 5861 times


  • Contest

    Green Solutions Awards 2017 - Buildings

    Energy & Temperate Climates
    Users' Choice



    Certification Scheme


    Location

    , 48000 Koprivnica Croatia

    Technicals Features