southwest clinical center

  • Project type : Renovation
  • Building Type : Other commercial buildings
  • Construction Year : 2003
  • Delivery year : 2017
  • Climate zone : [As] Tropical dry
  • Net Floor Area : 8 000 m2
  • Construction/refurbishment cost : 189 000 €
  • Number of Visitor : 139 Visitor
  • Cost/m2 : 24 €/m2
  • Cost/Visitor : 1 360 €/Visitor


Moderated by : Clément Gaillard

Similar case studies

Konseguela business Area, Mali

The Electrified Activity Zone (EAZ) is an innovative project developed by the Renewable Energy, Environment and Solidarities Group (GERES) to meet the energy needs of Very Small Enterprises (VSE) in rural Mali. In Konséguéla, this (...)

One Nation

One Nation is a shopping center "outlet" dedicated to ETDE luxury fashion brands. It is located in Clayes-Sous-Bois, west of Paris and near the Palace of Versailles (less than 10 km). The architect took into account the life cycle (...)

GREENTER

This building office and storage uses only wood structure 110m3. Its format is similar to a gymnasium, its thermal performance allows it to be Minergie labelled. With its simple skeleton, we can easily imagine transform it into an (...)


  • Published on 02 May 19
    by MARCELO SICOLI|International
    Viewed 602 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Health & Comfort
    Users' Choice


    • better protection against rain, dust and sun,
    • more beautiful, modern environment,
    • better natural lighting
    • more pleasant temperatures. Therewere gains in best air circulation.
    • acoustics, because the materialmakes less noise than the old one in case of rains, an important factor in abuilding consisting predominantly of medical and dental clinics.

    Certification Scheme


    Location

    SHCSW Lotes 3/4/5 sala 220, centro clinico sudoeste , 70673416 brasilia Brazil

    Technicals Features