Rchlo Ipanema CT - Filial 269
- by Anderson Calvo da Silva
- /
- 2019-06-14 04:06:16
- /
- International
- /
- 3530 / EN
Renovation
- Building Type : Downtown store
- Construction Year : 2015
- Delivery year : 2015
- Address 1 - street : 22410001 RIO DE JANEIRO, Brazil
- Climate zone : [Aw] Tropical Wet & Dry with dry winter.
- Net Floor Area : 1 304 m2
- Construction/refurbishment cost : 4 422 483 €
- Number of Visitor : 186 Visitor
- Cost/m2 : 3391.47 €/m2
-
Primary energy need :
369.8 kWhpe/m2.year
(Calculation method : Primary energy needs )
The store is the first LEED (Leadership in Energy and Environmental Design) certification process awarded by the U.S. Green Building Council (USGBC). Among the main sustainable initiatives are the installation of a rainwater reuse system, green roof deployment and the use of LED lighting.
See more details about this project
http://vogue.globo.com/moda/moda-news/noticia/2015/12/riachuelo-inaugura-sua-primeira-loja-verde-em-ipanema-no-rio-de-janeiro.htmlhttp://www.blogdafal.com.br/2016/01/18/riachuelo-ipanema/
Photo credit
Studio Demian Golovaty
Contractor
Construction Manager
Stakeholders
Construction Manager
NOROESTE CONSTRUÇOES E EMPREENDIMENTO LTDA
RENATO BARTOLOMEI
https://www.ncel.com.brCONSTRUTORA E INSTALADORA
Certification company
SUSTENTECH
Patrick Murisset
https://www.sustentech.com.brConsulting and certification manager LEED
Contracting method
General Contractor
Type of market
Realization
If you had to do it again?
Innovative and motivating experience.
Building users opinion
A new experience where one can share the technology associated with the well-being of people without losing sight of the environment.
Energy consumption
- 369,80 kWhpe/m2.year
- 497,51 kWhpe/m2.year
- 6 500,00 kWhpe/m2.year
Envelope performance
- 1,61 W.m-2.K-1
- 0,15
- 10,00
Real final energy consumption
256,81 kWhfe/m2.year
Systems
- No heating system
- No domestic hot water system
- Water chiller
- Fan coil
- VRV Syst. (Variable refrigerant Volume)
- Free-cooling
- compensated Air Handling Unit
- No renewable energy systems
Smart Building
Urban environment
- 382,00 m2
- 100,00 %
- 123,00
Product
Lojas Riachuelo Conceito - certificação leed serie Gold

FAL DESIGN E PROJETOS
CLAUDIA BEIRÃO CARDOSO
http://www.blogdafal.com.brStructural work / Structure - Masonry - Facade
rainwater system
100% led lighting system
lighting and air conditioning system controlled by automation
indoor / vertical landscaping.
Innovative, model and of great satisfaction.
The space, considered the first 'green store' of the network in Brazil, has several sustainable initiatives, among them the installation of a rainwater reuse system, the implementation of a green roof and LED lighting.
Life Cycle Analysis
Water management
- 10,00 m3
- 7,00 m3
- 20,00 m3
Indoor Air quality
Comfort
Reasons for participating in the competition(s)
AUTOMATION SYSTEM IN LIGHTING AND AIR CONDITIONING.RAW WATER REUSE SYSTEM.
GREEN AREA AND VERTICAL GARDEN.
AUTOMATED GARDEN IRRIGATION SYSTEM
APPLICATION OF BASIC AND FINISH MATERIAL WITH CERTIFICATE OF ORIGIN.
Building candidate in the category

Energy & Hot Climates

Users' Choice
Author of the page
Other case studies

Thermic renovation of a guard house with baked clay
- 17/03/2023
- /
- Taman Mhoumadi
- /
- 835

Townfield Head Farm
- 13/03/2023
- /
- Mark Woodward
- /
- 762

Public housing in Tarm
- 13/03/2023
- /
- Asta Justesen
- /
- 847

The Danish Nature Agency's official residence in Thy
- 13/03/2023
- /
- Asta Justesen
- /
- 737

Rådhuslunden_City hall grove
- 13/03/2023
- /
- Asta Justesen
- /
- 744

The Phenix
- 13/03/2023
- /
- Lemay
- /
- 669