Perlita Passive house

  • Project type : Renovation
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2017
  • Delivery year : 2017
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 197 m2
  • Construction/refurbishment cost : 540 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 2 741 €/m2
  • Cost/Dwelling : 540 000 €/Dwelling


Moderated by : Clément Gaillard

Similar case studies

Passive House Farhaus AF1

Detached family house in Castellterçol, a village 45kms in the north of Barcelona. The house has been built following the “Passivhaus standard”, and is actually is certification process (02/2013). The heating demand is 13kwh/m2&year (...)

Steel Farm

​Steel Farm is located near Hexham in the North Pennine Area of Outstanding Natural Beauty (ANOB). Built using traditional construction technology it is the first Certified Passivhaus in Northumberland. As organic farmers they owned (...)

Sustainable Passive House Fontana

A Passivhaus construction in central Italy, a temperate zone categorized as having cold winters and hot summers, that provides energy savings and reduces environmental footprint in a region where the technological requirements are


  • Published on 17 June 19
    by Xavier Gaucher|International
    Viewed 1178 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Users' Choice


    • ​comfort with very low energy consumption: 39 kWh/m²/yr
    • only 12 solar panels
    • black water and grey water pipes separated

    Certification Scheme


    Location

    4324 Perlita Avenue , CA 90039 Los Angeles USA

    Technicals Features