New Construction
- Building Type : Collective housing > 50m
- Construction Year : 2013
- Delivery year : 2015
- Address 1 - street : 100000 HANOI , Other countries
- Climate zone : [Cfa] Humid Subtropical - Mild with no dry season, hot summer.
- Net Floor Area : 169 654 m2
- Construction/refurbishment cost : 120 000 000 €
- Number of Dwelling : 1 500 Dwelling
- Cost/m2 : 707.32 €/m2
-
Primary energy need
16.3 kWhpe/m2.year
(Calculation method : Other )
See more details about this project
http://www.ecopark.com.vn/vi/khu-%C4%91%C3%B4-th%E1%BB%8B-ecopark/giai-%C4%91o%E1%BA%A1n-1/giai-%C4%91o%E1%BA%A1n-1.htmlhttps://www.construction21.org/data/sources/users/19262/1.pdf
Stakeholders
Investor
Viet Hung Company (VIHAJICO)
Email: [email protected]
http://khudothiecopark.vn/chung-cu-ecopark/Contracting method
General Contractor
Type of market
Realization
If you had to do it again?
Create a place for PV systems to use renewable energy for some part of the buildings such as hot water heating
Building users opinion
The building with great infrastructure and landscape surrounding. The outdoor activities are often performed here to attract people to live. However, it is quite far from city center.
Energy consumption
- 16,30 kWhpe/m2.year
- 43,50 kWhpe/m2.year
Envelope performance
- 1,39 W.m-2.K-1
- 0,01
Real final energy consumption
40,00 kWhfe/m2.year
40,00 kWhfe/m2.year
2 015
Systems
- No heating system
- Individual electric boiler
- Others
- Natural ventilation
- No renewable energy systems
Urban environment
- 40 100,00 m2
- 9 020,00 %
- 31 080,00
Product
Non-baked brick, low U-value for better insulation
khangminh
5th floor VG Building, 235 Nguyen trai stree, thanh xuan, Hanoi
http://gachkhangminh.vn/vn/tin-tuc/tin-tuc-su-kien/thi-truong-vat-lieu-xay-khong-nung-con-lam-gian-na_103_339_55.newsdStructural work / Structure - Masonry - Facade
Non-baked brick, low U-value for better insulation
concrete (light coloured painting) + plasterboard (Uvalue is ~1.39 W/m2K)
Meet the requirement of EEBC 09:2013/BXD
Construction and exploitation costs
- 64 000 000 €
Energy bill
- 384 000,00 €