Oficinas Santa Catarina ( FINSA offices )



Moderated by : Clément Gaillard

Similar case studies

Mohammed bin Rashid Space Centre

​Baptized "UAE's first sustainable autonomous house", this new office building in Dubai, was realized in 2016 as a pioneering “pilot project” for MBRSC, a governmental research body. It is the first one to obtain the certification (...)

Office Building of Hebei building science and technology research and Development Center

​<span lang="EN-US" style='background: white; color: rgb(34, 34, 34); font-family: "Arial","sans-serif"; font-size: 10.5pt; mso-bidi-font-size: 11.0pt; mso-fareast-font-family: 宋体; mso-fareast-theme-font: minor-fareast; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;'>The total construction area is 14527.17m2, underground area is 2164.87m2,6 floors area is 12362.3m2, the height of building is 23.55m, concrete framestructure, designed seismic intensity is 6 degrees;<span lang="EN-US" style='background: white; color: rgb(34, 34, 34); font-family: "Arial","sans-serif"; font-size: 10.5pt; mso-bidi-font-size: 11.0pt; mso-fareast-font-family: 宋体; mso-fareast-theme-font: minor-fareast; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;'>Use features: the building is (...)

King Hussein Business Park – Building Four

The King Hussein Business Park (KHBP) is strategically located adjacent to one of Amman’s busiest highways, offering easy access to downtown and other cities in the region. Situated in the heart of the business park, Building Four (...)


  • Published on 28 June 19
    by EDGE Buildings|International
    Viewed 3728 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    ​Energy (34 % energy savings): Reduced window to wall ratio, reflective paint/tiles for the roof, variable refrigerant volume (VRV) cooling system, energy-saving lighting and occupancy sensors.

    Water (32 % water savings): Low-flow faucets in bathrooms, dual-flush water closets and water-efficient faucets for kitchen sinks.

    Materials (42% less embodied Energy in Materials): Controlled use of concrete for floor slabs and internal walls, precast concrete panels for external walls and finished concrete flooring.

    Certification Scheme


    Location

    Parque FINSA Santa Catarina , 64000 Nuevo León Mexico

    Technicals Features