North Beach Project
- by Brian Guinan
- /
- 2019-06-06 06:58:40
- /
- International
- /
- 3927 / EN
New Construction
- Building Type : Isolated or semi-detached house
- Construction Year : 2018
- Delivery year : 2018
- Address 1 - street : 53B Sorrento Street 6020 NORTH BEACH , Other countries
- Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
- Net Floor Area : 326 m2
- Number of Dwelling : 1 Dwelling
-
Primary energy need :
25 kWhpe/m2.year
(Calculation method : Primary energy needs )
This truly indulgent 4 x 3 two-storey home is a modern design built to the world leading passive standards but crosses the boundary to where affordability and sustainability come together.This fabulous home is the only one of its kind in Western Australia and one of only two in all of Australia being CERTIFIED PASSIVE HOUSE PLUS and was proudly completed in just under six months for under $2,090.00 sq/m
The construction of the home to Passive Plus Certification ensures the homes energy use is net positive, not just now but for many years into the future.
Passive House is currently the most widely used form of sustainable construction throughout the world when seeking scientific assurance that the building's performance will, in fact, perform as intended. Passive House is specifically tailored to generate information to ensure the buildings performance and energy use, focusing particular attention on thermal performance and heating & cooling loads. Designing the home through the Passive House Planning Package affords the design team and the homeowner endless opportunity to explore all options of design and orientation while still maximising the full performance and budget of the building.
Combining passive design with innovative construction methods modelled specifically for the Western Australian climate ensures this home is not only sustainable, has net positive energy use, low carbon footprint but most importantly maintains a healthy and ambient living environment for the homeowners for many years into the future.
This particular home also proves the versatility of building a passive home. The original design was conceived by the client with very minimal changes made by the design team. The home was then built to what the client thought was passive principles. It was only after the completion of the home that they were made aware that the home was indeed a Certified Passive Plus home. This is further proof that building ‘better’ does not need to be more difficult, just better understood and executed.
With open-plan living, theatre room, raking ceilings and an elevated walkway between the upstairs bedrooms, this house embraces all the required elements of a passive home. Enjoy comfort and easy-living with perimeter bulk insulation,high-performance double-glazed windows, thermal bridge free construction,exceedingly high levels of air-tightness and heat recovery ventilation.
Upstairs, windows and doors to the northern and western elevations allow the sun in winter. And because this home expertly combines crucial elements in the passive house process, north facing skillion roof design is also incorporated for optimal PV panel installation.
The lower floor allows for easy open-plan living. Kitchen, living and dining areas effortlessly connect within the same floor space. The beautifully custom crafted kitchen with generous island bench and striking copper back-splash is the true heart of this home, offering comfort and quality.
See more details about this project
https://ismart-bg.com.au/projects/north-beach/Photo credit
Nathan Sixsmith
Contractor
Construction Manager
Stakeholders
Construction company
Ismart Building Group
[email protected], Brian Guinan Director & Registered Builder 5/82 Forsyth Street, O'Connor WA 6163
https://ismart-bg.com.auCertification company
Grun Consulting
Clare Parry [email protected] 0403-691-214
www.grunconsulting.comContracting method
General Contractor
Type of market
Realization
If you had to do it again?
I would spend a little more time in the design stage to try and minimise the site decisions relating to servicing the structure while maintaining airtightness and Bulk thermal insulation considering Thermal bridge free construction.
Energy consumption
- 25,00 kWhpe/m2.year
- 48,00 kWhpe/m2.year
Envelope performance
- 0,57
More information
Primary energy consumption is calculated according to australian standard - Primary energy consumption according to PHPP is 68 kWh /(m2a )
Generation of renewable energy: 79 kWh /(m2a ) based on the projected area
Renewable energy demand (PER demand according to PHPP): 30 kWh /(m2a ) on heating installation, domestic hot water, household electricity and auxiliary electricity
Systems
- Geothermal heat pump
- Heat pump
- Geothermal heat pump
- compensated Air Handling Unit
- Heat pump (geothermal)
Product
C70 Gold

Kömmerling
https://www.koemmerling.comFinishing work / Exterior joinery - Doors and Windows
LightBridge Grey

Viridian
https://www.viridianglass.comFinishing work / Exterior joinery - Doors and Windows
Renovent Excellent 400 Plus

Brink
https://www.brinkhrv.comHVAC, électricité / ventilation, cooling
Heat pump

Stiebel Eltron
https://www.stiebel-eltron.comHVAC, électricité / heating, hot water
Reasons for participating in the competition(s)
?Health and comfort: A heat recovery ventilation system throughout the home ensures fresh filtered and tempered air throughout the home 24 hours a day all year which also assists with maintaining ambient comfortable temperatures in the home YEAR-ROUND. The home has achieved passive house plus certification which ensures the homes build quality and performance is of the highest possible standard. This is the first home to be awarded this certification in Western Australia and only the second in all of Australia. This certification ensures the health and comfort levels of the home are of the highest possible standards available in the world today.
Low Carbon: The home is constructed of prefabricated external timber frame panels with a prefabricated timber frame roof and floor trusses which is then wrapped with world-leading vapour permeable membranes prolonging the life of the building structure for up to 100 years Extending the life of an already low carbon building. The use of low VOC products and polished concrete to the lower floor further reduced the carbon footprint of the build.
This home has an air-tightness result of .57 ac/h and has achieved passive house plus certification, the first of its kind in Western Australia and the second only in all of Australia to achieve this status. the passive house plus certification ensures the home will have outstanding performance and will have net zero energy use although it already shows to have quite a high net positive results thus outperforming its intended results.
Building candidate in the category

Energy & Temperate Climates

Low Carbon

Health & Comfort

Users' Choice
Author of the page
Other case studies

Thermic renovation of a guard house with baked clay
- 17/03/2023
- /
- Taman Mhoumadi
- /
- 769

Townfield Head Farm
- 13/03/2023
- /
- Mark Woodward
- /
- 713

Public housing in Tarm
- 13/03/2023
- /
- Asta Justesen
- /
- 783

The Danish Nature Agency's official residence in Thy
- 13/03/2023
- /
- Asta Justesen
- /
- 686

Rådhuslunden_City hall grove
- 13/03/2023
- /
- Asta Justesen
- /
- 698

The Phenix
- 13/03/2023
- /
- Lemay
- /
- 623