Neonatal department at Central Hospital in Karlstad

  • Project type : Renovation
  • Building Type : Public or private hospital
  • Construction Year : 2013
  • Delivery year : 2013
  • Climate zone : [Dfb] Humid Continental Mild Summer, Wet All Year
  • Net Floor Area : 1 250 m2
  • Construction/refurbishment cost : 6 100 000 €
  • Number of Bed : 13 Bed
  • Cost/m2 : 4 880 €/m2
  • Cost/Bed : 469 231 €/Bed


Moderated by : Sylvain Bosquet

Similar case studies

Pole SSR Hospital of New Orleans

Pole SRH 120 beds in the heart of New Orleans Hospital. Legibly mark with its identifiable marking the ellipse south of the city and the entrance area of ​​the Source, offering a landscaped setting quality NHO develops a compact (...)

Health House Billé

The SIVOM (Syndicat Intercommunal à VOcations Multiples) of BILLÉ - COMBOURTILLÉ - PARCÉ is made up of 3 municipalities which include, on 1 January 2012, 2277 inhabitants. These are rural communes located in the North-East of the depa (...)

Grand Santi Decentralized Prevention and Care Center

Grand Santi is a municipality on the Maroni river, it is only served by public transport. River (canoes) and by regional plane (15 places).


Testimonials


Comments


  • Published on 11 June 15
    by henric ernstson|International
    Viewed 4446 times


  • Contest

    Green Building Solutions Awards 2015

    Health & Comfort


    This buildingis the first project where it is investigated what impact in terms of reduced unwanted chemical presence does Landstingsfasigheter in Värmland achieve through theirwork and at what increased expenditure? 

    We canestablish that through active environmental choices approximately 800 kg of phthalates have not been released and that the benefit to the environment is not insignificant. In addition, we know that we did not have to use 1598kg PVC plastic by choosing a different superior plastic. These savings have been made at a cost that is less than 0.33% of the total of the building construction portion of the project of 1250 sqm.

      

    From a health perspective it will always be more important to control chemicals people come into direct contact with than those witch people will not have contact with. Control of exposure to indoor surfaces will be more important than outdoor exposure from facades or roofs. Emissions that take place outdoors will be diluted and have a lower concentration than if in doors. From a property owner's perspective, it is equally important to keep track of a substance whether it is outdoors, indoors or in small amounts, if the property owner at some time in the future might be required to sanitize in regards to aparticular substance.

     

    How do the environmental requirements work with production? Environmental demands work very well within modern building criteria, as no contractor wants to use materials that are dangerous. Both the contractor and the developer want a long durability and high function, no one wants buildings that will need to be sanitized or that their premises make people unwell.