Júlio Prestes Complex



Moderated by : Hassan ABOUZID

Similar case studies

Evocasa Selecta

Mixed use development comprising 77 apartaments spread from 2nd floor to 10th floor, offices on 1st floor and commercial spaces on ground floor. Regime of height 2B+GF+10F.

House on the Mountain

​The House on the Mountain was conceived as house for one family with three additional holiday apartments.It softly nestles against the slope and it’s size, roof shape and materials are inspired by the traditional „Wälderhaus“. The (...)

Passivhaus via Napoleone Bonaparte in Putignano

​Project:A low-cost Passivhaus in southern Italy was chosen as a sample project to test a compact solution for heating, cooling, DHW and mechanical ventilation. An integrated design approach made possible a cost-effective building (...)


  • Published on 05 June 19
    by EDGE Buildings|International
    Viewed 1609 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    31% Energy Savings
    Reduced window to wall ratio; insulation for roof; energy-saving lighting for internal areas, common areas, and external spaces; and lighting controls for common areas and outdoor spaces.

    32% Water Savings
    Low-flow showerheads, low-flow faucets for kitchen sinks and bathrooms, and dual-flush water closets.

    57% Less Embodied Energy in Materials
    In-situ reinforced concrete with more than 25% ground granulated blast-furnace slag for floors and roofs, and medium weight hollow concrete blocks for internal and external walls.

    Certification Scheme


    Location

    Torre 5 H2 Av. Duque de Caxias, 925 , 01214100 São Paulo Brazil