Indospace Industrial Park Vallam



Moderated by : Hassan ABOUZID

Similar case studies

Star Innovation Center passive factory project

The Star Innovation Center is a product development facility located outside of Colombo in Katunayake, Sri Lanka. Intended to be a global model for the entire garment industry, the project sets a new high bar for sustainability, energ (...)

Eco-construction of the bioclimatic wooden building at the Aubevoye wastewater treatment plant

The entire Aubevoye wastewater treatment plant responds to an innovative HQE® approach, proposing a bioclimatic timber frame construction building made of Douglas fir class 4, combined with natural and high-performance materials, enab (...)

Projet Première T12

Construction of a building with a surface area of 3300m2, workshop T12, located on a plot located on the production site of Compiègne already owned by the Owner CHANEL Parfums Beauté. The operation is part of the "Première" global (...)


  • Published on 28 June 19
    by EDGE Buildings|International
    Viewed 628 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    ​Energy (25% energy savings) : Reduced window to wall ratio and a skylight that provides daylight to 50% of the top floor area.

    Water (53% water savings): Dual flush water closets, water-efficient urinals, aerators and auto shut-off faucets and a black water treatment and recycling system.

    Materials (64 % less embodied energy in materials): Controlled use of concrete for floor slabs, steel sheets on steel rafters for roof construction, precast concrete panels and steel profile cladding for external walls, finished concrete flooring and aluminum window frames.

    Certification Scheme


    Location

    Vallam Village, Sriperumbudur Taluk,Kancheepuram District. , 600000 Chennai India

    Technicals Features