Ecoloft Jababeka Golf

  • Project type : Renovation
  • Building Type : Hotel, boarding house
  • Construction Year : 2017
  • Delivery year : 2017
  • Climate zone : [Af] Tropical Wet. No dry season.
  • Net Floor Area : 2 432 m2
  • Number of Bedroom : 19 Bedroom


Moderated by : Clément Gaillard

Similar case studies

Green Solution House

​GXN teamed with the owners ofthe Green Solution House to build both a successful business and ademonstration of circular sustainability.The renovation and expansionof this 4,500m2 hotel and conference center on the Danish island of (...)

Ascott Makati

Surrounded by steel-clad skyscrapers, Ascott Makati stands out from the busy city of Manila. The hotel offers guests a tranquil escape, while also providing easy access to the shopping hub of Ayala and nearby corporate offices such (...)

BIOHOTEL MED

​ABC


  • Published on 10 June 19
    by EDGE Buildings|International
    Viewed 519 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Low Carbon
    Health & Comfort
    Users' Choice


    82% Energy Savings
    Reduced window to wall ratio, external shading devices, insulation of roof and external walls, air conditioning system with high COP, energy-saving lighting system for internal spaces, common areas and external spaces, solar hot water collectors, and solar photovoltaics.

    31% Water Savings
    Low-flow faucets in kitchens and bathrooms, and dual-flush water closets.

    47% Less Embodied Energy in MaterialsCellular light weight concrete blocks for internal and external walls, parquet and wood block finishes and UPVC window frames.

    Certification Scheme


    Location

    Jl. Taman Golf Utama I No 5 Jababeka , 17530 Bekasi Indonesia

    Technicals Features