Almelo City Hall

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2013
  • Delivery year : 2015
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 20 409 m2
  • Construction/refurbishment cost : 58 765 578 €
  • Number of Work station : 493 Work station
  • Cost/m2 : 2 879 €/m2
  • Cost/Work station : 119 200 €/Work station


Moderated by : Construction21 Team

Similar case studies

Brock Environmental Center

The Brock Environmental Center is certified to the Living Building Challenge (LBC) and Leadership in Energy and Environmental Design (LEED) Platinum. The center is designed to be energy positive and zero water, and resilient to the (...)

Thai Health Promotion Center

​This building has been built for the Thai Health Promotion Organization.It is located in Sathorn district in Bangkok. Thai Health Promotion Organization is a non-profit organization dedicated to promote health and well-being of Thai (...)

Administration of nature and forests

A sustainable, environmentally friendly planning concept played a crucial role in this new build for the Luxembourg Nature and Forestry Agency. This energy-plus building, which can produce more energy than it consumes, is one of the (...)


  • Published on 11 March 16
    by Sylvain Bosquet|International
    Viewed 2360 times
  • Proposed by :




  • Certification Scheme


    Location

    Haven Zuidzijde 30 , 7607 Almelo Netherlands

    Technicals Features