Almelo City Hall

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2013
  • Delivery year : 2015
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 20 409 m2
  • Construction/refurbishment cost : 58 765 578 €
  • Number of Work station : 493 Work station
  • Cost/m2 : 2 879 €/m2
  • Cost/Work station : 119 200 €/Work station


Moderated by : Construction21 Team

Similar case studies

City Hall Venlo

The brief for the new City Hall presented a unique challenge in the form of stringent sustainability requirements set by Venlo municipality, which is the first region in the world to seek full implementation of the Cradle-to-Cradle (...)

Administration of nature and forests

A sustainable, environmentally friendly planning concept played a crucial role in this new build for the Luxembourg Nature and Forestry Agency. This energy-plus building, which can produce more energy than it consumes, is one of the (...)

CLT multicomfort office building

In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office (...)


  • Published on 11 March 16
    by Sylvain Bosquet|International
    Viewed 2497 times
  • Proposed by :




  • Certification Scheme


    Location

    Haven Zuidzijde 30 , 7607 Almelo Netherlands

    Technicals Features