ACLEDA Institute of Business

  • Project type : Renovation
  • Building Type : School, college, university
  • Construction Year : 2017
  • Delivery year : 2018
  • Climate zone : [Aw] Tropical Wet & Dry with dry winter.
  • Net Floor Area : 25 196 m2
  • Number of Pupil : 2 866 Pupil


Moderated by : Clément Gaillard

Similar case studies

RENOVATION OF THE SCHOOL GYM – MIDDLE SCHOOL “DANTE ALIGHIERI”

In the Mediterranean climate, through careful design based on sustainable bioclimatic study of the site, marked by the simple construction of the dry assembly, the project of renovation of an existing gymnasium obtains high performanc (...)

Universidad del Medio Ambiente

Ten years ago, a group of young Mexican professionals founded a university to address the environmental challenges that they saw in Latin America. Today, the Universidad del Medio Ambiente (UMA) offers master’s degrees, workshops, (...)

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)


  • Published on 06 June 19
    by EDGE Buildings|International
    Viewed 1357 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    Cambodia has a tropical climate with warm temperatures throughout the year.

    Energy (35% energy savings): Reduced window to wall ratio, insulation of roof, variable refrigerant volume (VRV) cooling system, energy-saving lighting and occupancy sensors in bathrooms.
    Water (44% water savings): Low-flow faucets and a black water treatment recycling system.
    Materials (32% less embodied materials): Cored bricks with plaster on both sides for internal and external walls.

    Certification Scheme


    Location

    Anlong Kangan Village, Sangkat Khmuonh, Khan Sen Sok , 12000 Phnom Penh Other countries

    Technicals Features