ACLEDA Institute of Business

  • Project type : Renovation
  • Building Type : School, college, university
  • Construction Year : 2017
  • Delivery year : 2018
  • Climate zone : [Aw] Tropical Wet & Dry with dry winter.
  • Net Floor Area : 25 196 m2
  • Number of Pupil : 2 866 Pupil


Moderated by : Clément Gaillard

Similar case studies

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)

Gerardo Arango S.J. School of Arts - Javeriana

The Gerardo Arango S.J. Building – School of Arts at the Pontificia Universidad Javeriana provides a space for students and the arts to flourish. The building is architecturally divided into three sections that represent different (...)

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)


  • Published on 06 June 19
    by EDGE Buildings|International
    Viewed 2088 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    Cambodia has a tropical climate with warm temperatures throughout the year.

    Energy (35% energy savings): Reduced window to wall ratio, insulation of roof, variable refrigerant volume (VRV) cooling system, energy-saving lighting and occupancy sensors in bathrooms.
    Water (44% water savings): Low-flow faucets and a black water treatment recycling system.
    Materials (32% less embodied materials): Cored bricks with plaster on both sides for internal and external walls.

    Certification Scheme


    Location

    Anlong Kangan Village, Sangkat Khmuonh, Khan Sen Sok , 12000 Phnom Penh Other countries

    Technicals Features