6 Pancras Square

12689
Last modified by the author on 01/09/2016 - 14:06

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2015
  • Delivery year : 2015
  • Address 1 - street : Pancras Square N1C LONDON, United Kingdom
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 38 643 m2
  • Construction/refurbishment cost : 100 899 500 €
  • Number of Work station : 3 864 Work station
  • Cost/m2 : 2611.07 €/m2

Proposed by :

Certifications :

  • Primary energy need
    49.26 kWhpe/m2.year
    (Calculation method : Other )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building
​BNP Paribas Real Estate presents 6 Pancras Square next to Saint Pancras station. The building was designed by Jean-Michel Wilmotte and will be developed by BNP Paribas Real Estate Property Development UK.The project comprises of offices and ground floor retail of 37,000 sqm on Argents 743,200 sqm redevelopment of the site. The scheme will benefit from its close proximity to the major transport hub of King’s Cross and Saint Pancras, providing easy access to six tube lines, national railways and the Eurostar.
The property will be developed to the highest environmental standards (BREEAM Excellent) and specification.
The development includes:
  • 350,000 sq ft of offices
  • 10,000 sq ft of retail
  • a 3,800 sq ft staff fitness centre
  • 27 parking spaces

Stakeholders



    Designer

    Adamson Associates

    Executive Architect


    Structures calculist

    AKT


    Other consultancy agency

    Hoare Lea

    Services Engineer


    Other consultancy agency

    Confluence

    Health and safety consultant


    Other consultancy agency

    Aecom

    Fire Strategy Consultant


    Other consultancy agency

    Reef Associates

    Facade access consultant


    Other consultancy agency

    Buro Happold

    Facade design consultant


    Other consultancy agency

    Gleeds Quantity Surveyors

    Quantity Surveyor

If you had to do it again?

We would reduce the complexity of the building comissioning

Energy consumption

  • 49,26 kWhpe/m2.year
  • Other

    Primary Energy need (kWh PE/m2/year) - UK SAP calculation
    Gas- 17.88
    Electricity- 48.49

    Breakdown for energy consumption
    Heating & Hot water - 17.88
    Lighting- 15.97
    Building services- 32.52
    Office equipment & small power- 42.58

Envelope performance

    Envelope U-value:
    Opaque- 0.18
    Glazing- 1.2

    AIR TIGHTNESS VALUE: 3.5 m3/m2/hr

  • 1,00
  • 3,50

Systems

    • Urban network
    • Urban network
    • Others
    • Fan coil
    • compensated Air Handling Unit

Smart Building

    Individual sub metering of every tenant floor

Urban environment

    Building is designed to integrate with the overall kings cross masterplan in terms of building use and ground level retail units. External lighting is integrated with the neighbouring buildings.

    The building is within 300m of Eurostar, King’s Cross station, London Underground and London bus services.

  • 100,00 %

Product

    Natural ventilation

    HVAC, électricité / ventilation, cooling

    features were inserted in the design wherever possible and with an understanding of the site constraints and acoustic obligations. This was combined with a highly efficient mechanical ventilation system with exhaust air heat recovery.


    Turbo core chiller systems

     

    HVAC, électricité / ventilation, cooling

    Ultra efficient ‘turbo core’ chiller systems using high-speed axial compressors, with the compressor turbine floating on magnetic bearings to eliminate friction in the main moving part, achieve demanding energy efficiency levels. Cooling systems built into the chillers pre-cool the chilled water from the building at low external ambient temperatures without the use of refrigeration equipment.


    Low carbon district heating network

     

    HVAC, électricité / heating, hot water

    The building benefits from connection to the King’s Cross low carbon district heating network, including heat from a mixture of CHP, efficient gas boilers and potentially Biomass boiler systems.

Comfort

    Summer- 24 degrees / Winter- 20 degrees

    Offices- NR38

GHG emissions

  • 60,00 year(s)

Reasons for participating in the competition(s)

Building candidate in the category

Energy & Temperate Climates

Energy & Temperate Climates

Users' Choice Award