Village hall La Boiserie in MAZAN

  • Project type : New Construction
  • Building Type : Concert or conference hall, theater
  • Construction Year : 2012
  • Delivery year : 2012
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 1 572 m2
  • Construction/refurbishment cost : 3 632 392 €
  • Number of Seat : 640 Seat
  • Cost/m2 : 2 311 €/m2
  • Cost/Seat : 5 676 €/Seat


Moderated by : Sylvain Bosquet

Similar case studies

Renovation of the sociocultural center of Val de Cisse

The Nazelles-Négron town hall has implemented an agenda 21 in which it wishes to work for the energy and ecological transition in response to the challenges of social equity, economic development and preservation of the environment (...)

Cultural and festive center: L’Etoile in Châteaurenard

BDM Approach: Silver level for construction phaseProgram: The former movie theater and the Etoile room change into a multipurpose room that can accommodate about 900 people and an auditorium for 270 people.Municipality of Châteaurenar (...)

Film complex in Rumilly

The building is located at the centroid of a peri-urban parcel, according to the guidelines of the site and weaves natural links with the amenities of the commercial area by a scripted writing of plantations and pathways. architecture (...)


Testimonials


Comments


  • Published on 12 July 13
    by Olivier SOUQUET|France
    Viewed 9125 times


  • Certification Scheme


    Location

    150 Route de Modène , 84380 MAZAN France

    Technicals Features