URMA de Bruay / Saint-Saulve

  • Project type : New Construction
  • Building Type : School, college, university
  • Construction Year : 2018
  • Delivery year : 2018
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 9 395 m2
  • Construction/refurbishment cost : 21 830 000 €
  • Number of Pupil : 1 300 Pupil
  • Cost/m2 : 2 324 €/m2
  • Cost/Pupil : 16 792 €/Pupil


Moderated by : Sylvain Bosquet

Similar case studies

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)

ACLEDA Institute of Business

For years, ACLEDA Bank recruited the largest number of college graduates in Cambodia. As the demand for skilled professionals began to outpace the supply of graduates, ACLEDA Bank decided to build their own business school to address (...)


  • Published on 18 June 18
    by Jean Luc Collet|France
    Viewed 7031 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Health & Comfort
    Users' Choice


    • Control of the interior comfort by a natural ventilation activated very low pressures.
    • Insertion of low temperature solar collectors by windows and solar cladding, then high temperature aerovoltaic roof.
    • Recovery optimization of sensible and latent calories.
    • Climatic well activated in temperate tertiary premises.
    • Piles in thermoactive foundations for heating and direct cooling.
    • Enhanced recovery of fatal calories from greywater.

    Certification Scheme


    Location

    , 59880 Saint-Saulve France

    Technicals Features