Urbawood Lille

15575
Last modified by the author on 22/05/2015 - 11:20

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2014
  • Delivery year : 2014
  • Address 1 - street : 59000 LILLE, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 2 587 m2
  • Construction/refurbishment cost : 2 600 000 €
  • Number of Work station : 299 Work station
  • Cost/m2 : 1005.03 €/m2

Proposed by :

  • Primary energy need
    53 kWhep/m2.an
    (Calculation method : RT 2005 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

URBAWOOD is an innovative project of commercial building 100% wood, "oriented" sustainable development, born from the combination of 3 companies: Gerim, Nacarat Wood Construction and Design.
This concept was realized for the first time on THE urbawood located in Lille. In short:

  • Surfaces: 2500 sq.m. / 2,250 m² Useful Surface (5 levels)
  • Capacity: 299 people
  • Level Energy Performance BBC (Low Consumption Building)
  • Location: Quai Hegel - ZAC Euratechnologies - Lomme (59)


https://www.youtube.com/watch?v=KO1Y0GH9-Pg

Sustainable development approach of the project owner

Nacarat develops a​ committed sustainable development approach, based on an exeplary and certified ecodesign tool.
Here, URBAWOOD is a turn key solution made out out of wood to the creation of tertiary spaces. This efficient concept of modular building makes possible the construction of RT2012 office buildings within weeks. The surfaces keep all the promises made in terms of construction reliability, deadlines ...

The first 4 level building (representing 2,600 m²) was built in less than 6 weeks!

Architectural description

Developed by Nacarat and designed with the architecture firm Agence A, this new 2,600m² large building was built with an industrial 100% wood process (European and PEFC certified), for the production of the two facades, floors, the partitions and the elevator shaft. From the foundations on March 12, 2012 to the end of the envelope on June 10th, it took only three months for regional construction companies Gérim and Création Bois to achive the construction.

The well-being of future occupants is also one of the ambitions of the project, because beyond the warmth and natural look provided by wood, they will benefit from a high level of thermal and visual comfort, enhanced by integration of sunscreens on exposed facades.

Building users opinion

"The Urbawood building was built in record time, with an innovative process. We have installed on the first three levels, our ADICODE® spaces (innovation and co-design workshops). Installing innovative spaces in an innovative building, what a coincidence and a symbol for us to use in promotion!"

The completion of construction was done in excellent collaboration - and in a very united way - with teams from Nacarat, who were able to meet our deadlines and our ... "quirks"!

It is a building where it feels good to be, wooden construction gives a real cozy dimension. Several months after we moved in, the scent of the wood still exhales into the stairwell, it reminds itself to us with each pass, it's a nice touch for the "inhabitants" of the "house." "

Céline Dubois-Duplan, Marketing Manager / Corporate Relations Group HEI ISA ISEN, pilot ADICODE®

If you had to do it again?

Other Urbawood concept projects are currently in design in 2015. Other 100% wood projects or with wood facade / concrete core are under construction, while others have already been delivered.

See more details about this project

 http://www.urbawood.fr/

Stakeholders





    Designer

    cabinet d'architectes Agence A

Contracting method

Off-plan

Energy consumption

  • 53,00 kWhep/m2.an
  • 115,00 kWhep/m2.an
  • RT 2005

    Heating: 12 kWhEP / m² / year
    Lighting: 27
    Hot Water ref: 0
    Auxiliary: 14.4

Envelope performance

  • 0,35 W.m-2.K-1
  • 100% Wood, including the elevator shaft.

Systems

    • Condensing gas boiler
    • Water radiator
    • No domestic hot water system
    • No cooling system
    • Nocturnal Over ventilation
    • Double flow heat exchanger
    • No renewable energy systems

Smart Building

    To provide optimum control of the installation, EFFIPILOT takes into account daily occupancy data, comfort, related to weather forecasting and to the building inertia. These data are then introduced into algorithms

Urban environment

  • 1 200,00 m2
  • 60,00 %
  • 40,00
  • Located in Euratechnologies, a many times national award-winner eco-district, Urbawood® is part of an innovative, mixed urban project designed by Soreli. This new district of Lille -where Nacarat is also developing three other Programmes - will eventually include 1,600 residents and 3,000 jobs in the ICT sector.

Product

    Effipilote

    Effigénie

    Camille Thiriez

     https://www.effigenie.com/

    Management / Facility management

    Control and optimization of the Building Management System

    The system seems to pose no concern.

Construction and exploitation costs

  • 160 000
  • 2 600 000

Water management

    Phytoremediation on Euratechnologie area for rainwater

Indoor Air quality

    An air quality study was conducted by the Ecole des Mines de Douai, specifically to test the methodology on a wooden building. The results of the methodology are satisfactory ... and the measurements of air quality too.

Comfort

    Despite the acoustic qualities recognized by the user, the building has not passed the theoretical level requested by Certivéa. This gap prevents the building to get the BBC label Effinergie although it has the required energy potential

GHG emissions

    Rabot Dutilleul realized 3. Scope 3 carbon footprint more than 2/3 of broadcasts from reinforced concrete used in our constructions. Obviously, a building 100% (European PEFC) can only be favorable in comparison to a more technical conventio

Life Cycle Analysis

Reasons for participating in the competition(s)

​Biosourcé : 100% bois Smart Building : Solution Effipilote pionnière en matière de pilotage de GTB Santé confort : 100% bois intérieur extérieur; primé AMO 2014 pour la qualité au travail, analyse qualité de l'air spécifique (batiment bois) par l'Ecole des Mines de Douai
Troisième Révolution Industrielle :
  • Efficacité énergétique
  • Economie Circulaire
  • Réseaux intelligents
Green Building Solutions Awards 2016
PDF

Share :
Author of the page

Rodolphe Deborre

Directeur Innovation et Renaissance Ecologique


Other case studies

More

Contest

Green Building Solutions Awards 2016