The "Marais Girard" farmhouse

13431
Last modified by the author on 25/06/2015 - 11:19
  • Building Type : Hotel, boarding house
  • Construction Year : 2013
  • Delivery year : 2014
  • Address 1 - street : Le Marais Girard 85470 BRETIGNOLLES SUR MER, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 1 300 m2
  • Construction/refurbishment cost : 2 600 000 €
  • Number of Bedroom : 15 Bedroom
  • Cost/m2 : 2000 €/m2
  • Primary energy need
    23 kWhep/m2.an
    (Calculation method : RT 2005 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

The old farmhouse “Marais Girard" is located 300 m from the beach, at the joint between a residential area, a rural area of ​​marshes and a beach area. The site, with an area of ​​1.2 ha includes two existing buildings: the farm house with its barn and a wetland fed by a landscaped valley.The project consists in the creation of an ecological village for holidays composed of 16 villas (3 types) and common buildings (restaurant, bar, pool,participatory kitchen, greenhouse, dryer, hall creations). The program facilities and architecture meet the needs of vacationers affording privacy while providing a strong connection with the natural environment, the urban context and seaside activities. Traffic on the site is done only on foot or by bike.The bias of the villas is to provide a real time spatial experience in a summerstay.

Sustainable development approach of the project owner

The client wanted a global sustainable development approach so induced in all areas of the project from its planning to its operation. Therefore, we participated in creative workshops on this topic to determine most relevant fields of action to develop and how to prioritize the project. The sustainable development approach is therefore built on programming, integration into the site,design of buildings, construction processes and materials, recovery, equipment, renewable energy, usage, maintenance ... even the choice of detergents to laundry services.

Architectural description

The old farmhouse "Marais Girard" is located 300 m from the beach, at the joint between a residential area, a rural area of ​​marshes and a beach area. With a total area of ​​1.2 ha the site includes two existing buildings: the farm house and barn and the wetland fed by a landscaped valley. The project consists in creating an ecological holiday village composed of 16 villas (first phase:pontoons villas made), 5 guest rooms, a company housing and communal buildings (restaurant, bar, pool, kitchen participatory, greenhouse, dryer, hall creations). The program, facilities and architecture meet the needs of privacy of vacationers while providing a strong connection with natural environment, urban context and seaside activities. Circulation on the site is done only on foot or by bike. The bias of the villas is to provide a real time spatial experience in a summer stay. Public areas are partly formed by the old farmhouse rehabilitation and partly by the new construction. The program draws its originality from close collaboration between the main contractor and the client in feasibility phase / programming. This architectural program was developed after creative workshops and includes:

- A hall that will host the creations of temporary events such as designers markets, flea markets, organic markets. - A "collective kitchen" restaurant is designed in a close relation with a garden of flavors and a vegetable greenhouse that will host school groups to introduce them to organic food.
- A "natural laundry service" for washing and natural drying for the hotel and families staying at the villas. This device incorporates the features of "local dryers" and reduces the carbon footprint while ensuring an educational and recreational tool.
- The "pontoons villas" were created for seasonal use from April to October. These habitats are exploring the boundary between inside and outside by a set of sealed and insulated modules, as the rooms and the bathroom, which define a common living space with the possibility to completely open to the outside. These spaces are allocated on a levitating pontoon where are placed the private and public terraces, accesses and outdoor showers. - An intermediate level between the level of housing and land allow seats in the South directly related to the protected area of the reed bed and avoid the installation of railings. These spaces are deployed under a common protection of roof solar panels. The other patio perched Villas will be conducted in a second phase of construction.

Building users opinion

Information to be collected for managers.

If you had to do it again?

Convincing the owner to build all the Villas at once and not in two different phases due to the difficulties for landscape regeneration and constraints of seasonal activity.

Stakeholders

Contracting method

Other methods

Energy consumption

  • 23,00 kWhep/m2.an
  • 45,00 kWhep/m2.an
  • RT 2005

    Too complex because several buildings and seasonal use

  • 150,00 kWhep/m2.an

Real final energy consumption

    23,00 kWhef/m2.an

Envelope performance

Systems

    • Electric radiator
    • Wood boiler
    • Solar Thermal
    • No cooling system
    • Natural ventilation
    • Free-cooling
    • Humidity sensitive Air Handling Unit (Hygro B
    • Solar Thermal
    • Wood boiler

    conception bioclimatique

Urban environment

  • 12 000,00 m2
  • 30,00 %
  • 8 000,00
  • The old farmhouse "Marais Girard" is located 300 m from the beach, at the joint between a residential area, a rural area of ​​marshes and a beach area. The site with ​​1.2 ha, includes two existing buildings: the farm house and barn and a wetland fed by a landscaped valley.

Product

    ISONAT more 55 Flex

    BUITEX

    ZA Le Moulin - 10, rue Pierre Giraud BP 23 - 69470 COURS-LA-VILLE Tél. 04 74 89 95 96 Fax 04 74 89 88 89 [email protected]

     http://www.buitex.fr/fr/batiment/

    Finishing work / Partitions, insulation

    Wood fiber for insulation between wooden posts of 145mm

    Difficultty in it acceptance by the control office. As a public establishment,high fire resistance standars were required. So, percentages of wood used for interior coatings were negociated and firewall (as fermacell) screens were implemented to mix with interior finishes.


    Rexolatte The wood fiber plaster M0 ERP

    UNILIN

    [email protected] Tél: + 33 (0) 148 94 96 86 UNILIN INSULATION SAS Immeuble Estreo 1-3 rue d'Aurion 93110 Rosny-sous-Bo

     http://www.unilininsulation.com

    Structural work / Carpentry, cover, titghtness

    Insulating sandwich panels with integrated chevrons to isolate existing buildings over the frame and leave well apparent.

    Difficulty in acceptance by the control office for the fire resistance + project economics.

Construction and exploitation costs

  • 90 000,00
  • 206 000
  • 2 600 000

GHG emissions

  • 13,00 KgCO2/m2/an
  • 2005 BBS software CLIMAWIN SLAMA

Life Cycle Analysis

    Wood fiber insulation, insulating lime-hemp materials recovery site as tiles or rafters, ...

Reasons for participating in the competition(s)

​L'objectif de cette construction consistait à utiliser au maximum les matériaux biosourcés et ceux présents sur le site comme les matériaux issus de la déconstruction pour une réutilisation originale et économe malgré les difficultés de normes et réglementations liées aux établissements recevant du public et à la construction en général.
  • Tous les isolants sont naturels et les bois de construction et finition sont certifiés.
  • Les revêtements intérieurs dans les anciens bâtiment de la ferme rénovés sont en chaux/chanvre.
  • Les bois issus de la déconstruction d'une grange on été réutilisés en cloisons séparatives et décoration dans les chambres et espaces communs. Les chevrons ont été coupés et utilisés pour constituer un bardage pour l'accueil sous forme de patchwork.
  • Les tuiles de l'existant qui ont dues être changées ont été utilisées pour constituer les murs d'un séchoir au naturel pour le linge de l'hôtel et les besoins des vacanciers.
Cette réalisation a vu le jour grâce à une maîtrise d'ouvrage convaincue, des entreprises engagées et une équipe d'architectes déterminée à suivre leurs engagements communs concernant l'exemplarité de cet ouvrage.

Building candidate in the category

Bio-based Materials

Bio-based Materials