The La Buissière parcel platform

4873
Last modified by the author on 29/03/2021 - 10:06

New Construction

  • Building Type : Logistics warehouse
  • Construction Year : 2017
  • Delivery year : 2019
  • Address 1 - street : zone artisanale 38530 LA BUISSIèRE, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 9 640 m2
  • Construction/refurbishment cost : 10 500 000 €
  • Cost/m2 : 1089.21 €/m2

Certifications :

  • Primary energy need
    124 kWhep/m2.an
    (Calculation method : RT 2012 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

Built in 2019, the La Buissière parcel platform is divided into two parts: the production hall side, where parcels are processed, and the office side. Approximately 130,000 parcels are processed on site every day. The platform has obtained the NF HQE "very good" certification.

Optimising building management

The platform is equipped with a Building Management System (BMS), which provides global control by strictly monitoring the different consumption levels of each device in real time. Some of the systems are automated. For example, for the tertiary sector, CO2 sensors have been installed in the meeting rooms to control ventilation automatically according to the concentration of CO2. Sensors have also been placed on the windows, automatically stopping the air conditioning or heating when they are opened.

High-performance equipment guarantees comfort

The project owners have taken care to install high-performance equipment that guarantees the building's energy capacity:

  •     Heating and domestic hot water are provided by a heat pump. Coupled with the thermal performance, this enables the operation to obtain a level A label for GHG emissions.
  •     As regards lighting, whether zenithal through skylights or from the faults in the façades, natural light was favoured for the production hall. To protect against the sun, the openings are equipped with tiltable sunshades and the office windows with mobile blinds. All electrical lighting is provided by LEDs. It is accompanied by a presence detection system in most of the premises.
  •     Natural ventilation was favoured in the project, coupled with a mechanical double flow system in the tertiary part.
  •     Natural cooling has also been encouraged, thanks to the possibility of equipping the platform with adiabatic cooling with the implementation of waiting systems every two doors at the platform.
  •     Finally, the building can accommodate renewable energy. The roof has been pre-dimensioned for a future installation (PV Ready).

Integrating into its environment (land artificialisation and classified area)

The project leaders had to pay particular attention to the integration of the platform into its environment.

Indeed, as the building is located near a listed fort, the community of communes requested that the platform fit in well with the landscape. An airy wooden cladding was therefore put in place around the technical installations on the roof, in order to limit visual nuisance.

The project leaders also worked on maintaining ecological zones to compensate for the use of previously undeveloped land. The greening work went beyond the demands of the Local Urban Plan, notably through the creation of an ecological corridor and a protected green zone between the motorway and the parcel platform. In terms of waterproofing, rainwater management is guaranteed thanks to the installation of 5 vegetated infiltration basins allowing water to be managed on a parcel basis.

The entire building has also been designed to be flexible and to avoid major renovations to adapt it to future requirements.

Sustainable development approach of the project owner

In order to compensate for the artificialization of the soil necessary for the project, the client wanted the building to have as limited an environmental impact as possible. This results in the installation of high-performance energy equipment or using natural elements (light, ventilation) and the optimization of these thanks to a BMS. The project leaders have also implemented virtuous management of water and natural spaces, while optimizing the building's life cycle through a design that promotes flexibility.

Architectural description

The architecture of the building was designed to fit into its environment. The hall is dark in color, which allows it to blend into the landscape. The facade of part of the building was made of wood, at the request of the community, in order to limit the visual impact of the whole (which is located near a classified site). Only the office section stands out, thanks to orange facades, which allows it to be visually identified.

Photo credit

Florent Michel

Contractor

Construction Manager

    Artelia batiment et industrie

    ARTELIA Bâtiment & Industrie Adresse Postale : 47 avenue de Lugo - CS 20349 – 94607 CHOISY LE ROI CEDEX · France Tél. : +33 (0) 1 77 93 78 13·

     http://www.arteliagroup.com/

Stakeholders

    Designer

    Architecte : AFA Architectes

    romain.frou[a]afa-architectes.com 47 avenue de Lugo - 94600 Choisy-le-Roi Mobile.+33 (0)6 21 16 11 63

     https://www.afa-architectes.com/fr

Energy consumption

  • 124,00 kWhep/m2.an
  • 365,00 kWhep/m2.an
  • RT 2012

    Primary energy: - heat. : 44 kwhep / m².year - Cool. : 1.9 kwhep / m².year - DHW: 1.8 kwhep / m².year - Eclair. : 59.3 kwhep / m².year - To the. dist. : 6.2 kwhep / m².year - To the. wind. : 11.1 kwhep / m².year Final energy: - heat. : 17.1 kwhep / m².year - Cool. : 0.7 kwhep / m².year - DHW: 0.7 kwhep / m².an - Eclair. : 23 kwhep / m².year - To the. dist. : 2.4 kwhep / m².year - To the. wind. : 4.3 kwhep / m².year

Real final energy consumption

    48,20 kWhef/m2.an

Envelope performance

  • 0,40 W.m-2.K-1
  • HD External Walls Loss: 6198.29 W / ° C
    Internal Wall Losses HU: 316.36 W / ° C
    Soil loss HS: 1922.45 W / ° C
    Total surface area of AT leakage walls: 21 313.05 m²
    Surface of the external walls excluding floor: 13,085.12 m²

  • 2,43

Systems

    • Heat pump
    • Heat pump
    • VRV Syst. (Variable refrigerant Volume)
    • Natural ventilation
    • Double flow heat exchanger

Smart Building

    Implementation of a GTB to optimize consumption (heating, ventilation, air conditioning, water, lighting). Settings and programming possible on each device. All counters are accessible.

Urban environment

    The parcel platform is located more in the urban periphery, outside a dense urban fabric. It is particularly surrounded by fields and natural spaces. It is bordered by two roads: the A41 and the D1090. It is also located near the Isère.

Construction and exploitation costs

  • 15 500 000
  • land 2.9 M €, Works 10.5 M €, Fees 1.27 M €

Indoor Air quality

    Natural ventilation is used in almost the entire building. It is coupled with double flow in the office part. CO2 sensors have been installed in the meeting rooms. They automatically trigger ventilation as needed.

Comfort

    The presence of numerous green spaces all around the building and CO2 sensors ensure that occupants have a good working environment, which does not negatively impact their health.

GHG emissions

  • 5,00 KgCO2/m2/an

Reasons for participating in the competition(s)

Le confort et la santé des occupants du bâtiment sont au coeur du projet. 

Ces deux éléments sont notamment assurés par :

  • la présence de systèmes énergétiques performants qui permettent d'arriver à un confort et une qualité d'air intérieur optimale en limitant les consommations : PAC, LEDs, ventilation double-flux.
  • l'optimisation de l'environnement immédiat et des apports liés aux éléments naturels : éclairage naturel, fenêtres équipées de brise soleils, systèmes de ventilation et rafraîchissement naturels.

Le bâtiment entier est piloté par une GTB, ce qui permet d'optimiser l'expérience qu'en ont les occupants, en fonction de leurs besoins et usages, tout en diminuant la consommation énergétique de la plateforme. L'installation de sondes CO2 permet de contrôler qualité de l'air intérieur en continu.

Building candidate in the category

Health & Comfort

Health & Comfort

Green Solutions Awards 2020-2021
PDF
 construction logistics energy performance comfort and health biodiversity

Share :
Author of the page

Claire VENTEJOU

Responsable Développement Durable


Other case studies

More

Contest

Green Solutions Awards 2020-2021