The 7 pavilions of the cave of Salamandre

  • Project type : New Construction
  • Building Type : Other building
  • Construction Year : 2013
  • Delivery year : 2013
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 180 m2
  • Construction/refurbishment cost : 620 000 €
  • Number of none : 500 none


Moderated by : Sylvain Bosquet

Similar case studies

Kaza Eco-Community Centre

In partnership with the Spiti Projects Charity, the Auroville Earth Institute has designed and built theKaza Eco- Community Centre with key participation of villagers in Kaza and local earth craftsmen of the Spiti Valley. The centre (...)

Maison des Yvelines - Nubian Vault

This amazing Nubian Vault* building, inaugurated on Dec 4th 2016, is one of AVN's major recent achievements in Senegal. Financed in part by the French Conseil Départemental des Yvelines, in collaboration with the NGO Le Partenariat (...)

City Hall and multifonction space in Champneuville (55)

Meuse Energie Nouvelle 2011 Label (New Energy in Meuse) Energy requirements management on patrimonial buildings by EDF Rubans du patrimoine 2013 LQE 2013 Prize winner (Environmental Quality in Lorraine) The city’s project is committ (...)


  • Published on 15 June 18
    by Jean-François Daures|France
    Viewed 3640 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Low Carbon
    Users' Choice


    • Construction and furniture 100% local wood
    • Autonomous energy building (1st cave lit by solar energy)
    • Building and cave 100% accessible to all types of handicap
    • Green ceiling
    • Construction in Protected Natura 2000 Zone
    • 1st prize Arfobois 2013 competition
    • Finalist of the Grand Prix of the Order of Architects - region Occitanie

    Certification Scheme


    Location

    Chemin de la plage du Roy , 30430 Méjannes le Clap France

    Technicals Features