The 7 pavilions of the cave of Salamandre

  • Project type : New Construction
  • Building Type : Other building
  • Construction Year : 2013
  • Delivery year : 2013
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 180 m2
  • Construction/refurbishment cost : 620 000 €
  • Number of none : 500 none


Moderated by : Sylvain Bosquet

Similar case studies

Basuna Mosque

The Basuna Mosque is located in the hot & arid village of Basuna, Sohag, Egypt, over a site amidst a noisy, dusty and densely constructed area with encroaching residential buildings, a cemetery, cattle frequently moving back and forth (...)

Maison des Yvelines - Nubian Vault

This amazing Nubian Vault* building, inaugurated on Dec 4th 2016, is one of AVN's major recent achievements in Senegal. Financed in part by the French Conseil Départemental des Yvelines, in collaboration with the NGO Le Partenariat (...)

Kaza Eco-Community Centre

In partnership with the Spiti Projects Charity, the Auroville Earth Institute has designed and built theKaza Eco- Community Centre with key participation of villagers in Kaza and local earth craftsmen of the Spiti Valley. The centre (...)


  • Published on 15 June 18
    by Jean-François Daures|France
    Viewed 4442 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Low Carbon
    Users' Choice


    • Construction and furniture 100% local wood
    • Autonomous energy building (1st cave lit by solar energy)
    • Building and cave 100% accessible to all types of handicap
    • Green ceiling
    • Construction in Protected Natura 2000 Zone
    • 1st prize Arfobois 2013 competition
    • Finalist of the Grand Prix of the Order of Architects - region Occitanie

    Certification Scheme


    Location

    Chemin de la plage du Roy , 30430 Méjannes le Clap France

    Technicals Features