Territorial Unit for Prevention and Social Action

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2014
  • Delivery year : 2014
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 2 217 m2
  • Construction/refurbishment cost : 3 758 638 €
  • Number of Work station : 80 Work station
  • Cost/m2 : 1 695 €/m2
  • Cost/Work station : 46 983 €/Work station


Moderated by : C21 France La redaction

Similar case studies

My Republic Plaza (Green Office Park 6)

​My Republic Plaza (Green Office Park6) is located in foot print area amounted 12,890 m2 has five floors for work space and basement. It also becomes one of part in Green Office Park BSD City which built base on Green Building Concept (...)

Brock Environmental Center

The Brock Environmental Center is certified to the Living Building Challenge (LBC) and Leadership in Energy and Environmental Design (LEED) Platinum. The center is designed to be energy positive and zero water, and resilient to the (...)

CLT multicomfort office building

In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office (...)


  • Published on 08 September 17
    by Didier CONSTANT|France
    Viewed 4155 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice



    Certification Scheme


    Location

    , 59287 Guesnain France

    Technicals Features