Projet Première T12

  • Project type : New Construction
  • Building Type : Factories
  • Construction Year : 2016
  • Delivery year : 2016
  • Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
  • Net Floor Area : 3 300 m2
  • Construction/refurbishment cost : 5 000 000 €
  • Number of Installed Kw : 1 576 Installed Kw
  • Cost/m2 : 1 515 €/m2
  • Cost/Installed Kw : 3 173 €/Installed Kw


Moderated by : Julien MARQUES

Similar case studies

Star Innovation Center passive factory project

The Star Innovation Center is a product development facility located outside of Colombo in Katunayake, Sri Lanka. Intended to be a global model for the entire garment industry, the project sets a new high bar for sustainability, energ (...)

Indospace Industrial Park Vallam

Near major highways and easily accessible to Chennai, the IndoSpace Industrial Park Vallam is situated in an ideal location for the warehousing sector. The park consists of four buildings, one of which has received EDGE certification (...)

Municipal Technical Center - La Roche Sur Yon

On this project, the initial objective of the contracting authority was the partial demolition of municipal technical center and the creation of a new building with a standard thermal performance level (RT2012 for the office and works (...)


  • Published on 09 June 17
    by willy loire|France
    Viewed 4732 times


  • Contest

    Green Solutions Awards 2017 - Buildings

    Health & Comfort
    Users' Choice



    Certification Scheme


    Location

    7 rue Ferdinand de Lesseps, ZAC de Mercières , 60205 Compiègne France

    Technicals Features