Operation Magnolias

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2015
  • Delivery year : 2016
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 3 681 m2
  • Construction/refurbishment cost : 1 886 450 €
  • Number of Dwelling : 23 Dwelling


Moderated by : C21 France La redaction

Similar case studies

The First ECO-SANDWICH House

The First ECO-SANDWICH® House is a unique example of a holistic and innovative approach to sustainable architecture. The house is the first of twelve planned passive house energy standard multi-family houses in the green area of City (...)

Passivhaus via Napoleone Bonaparte in Putignano

​Project:A low-cost Passivhaus in southern Italy was chosen as a sample project to test a compact solution for heating, cooling, DHW and mechanical ventilation. An integrated design approach made possible a cost-effective building (...)

Flatmettoekomst - Utrecht (net zero-energy 'flat for the future')

Flatmettoekomst is a net zero energy retrofit of apartment buildings dated from the early sixties of last century. The project consist of 48 apartments. Currently an additional 80 apartments are retrofitted with the same concept.This (...)


  • Published on 12 June 18
    by Jean-Louis Dubourdieu|France
    Viewed 3904 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    - DENSIFICATION
    - BIOSOURCE BUILDINGS LEVEL 3

    - PREFABRICATION
    - THERMAL PERFORMANCE
    - COMFORT OF ETE- MONITORING CONSUMPTION


    Certification Scheme


    Location

    , 31400 TOULOUSE France

    Technicals Features