The Crematorium intercommunal project is located in the heart of the new industrial zone of Butay, located south-west of the commune of Château-Thébaud. The proximity of the motorway A83, the RN 249 and the departmental road 137 gives (...)
This building office and storage uses only wood structure 110m3. Its format is similar to a gymnasium, its thermal performance allows it to be Minergie labelled. With its simple skeleton, we can easily imagine transform it into an (...)
Complex of 55,000m2, built in the heart of the old coalfield Lorraine, near Germany, integrating: A shopping center including an Auchan hypermarket and about 60 banners; A retail of 10 banners; Restaurants including a Mac Donald. (...)
Shopping centers generally need significant amounts of energy (occupations, significant artificial lighting, etc...). More specifically, energy consumptions are related to air conditioning (enormous even in winter) to the point where air conditioning consumptions exceeds heating consumptions.
Alain Garnier engineering consultants looked for a way to reduce these consumptions by implementing production units of chilled water, allowing free chilling in the building.
This method, produces cold by using the difference of temperature with the outside to trigger a natural cooling, without switching compressors on.