Novartis campus / Voyager

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2019
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 42 000 m2
  • Construction/refurbishment cost : 130 000 000 €
  • Number of Work station : 2 800 Work station


Moderated by : Hassan ABOUZID

Similar case studies

Mohammed bin Rashid Space Centre

​Baptized "UAE's first sustainable autonomous house", this new office building in Dubai, was realized in 2016 as a pioneering “pilot project” for MBRSC, a governmental research body. It is the first one to obtain the certification (...)

Office Building of Hebei building science and technology research and Development Center

​<span lang="EN-US" style='background: white; color: rgb(34, 34, 34); font-family: "Arial","sans-serif"; font-size: 10.5pt; mso-bidi-font-size: 11.0pt; mso-fareast-font-family: 宋体; mso-fareast-theme-font: minor-fareast; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;'>The total construction area is 14527.17m2, underground area is 2164.87m2,6 floors area is 12362.3m2, the height of building is 23.55m, concrete framestructure, designed seismic intensity is 6 degrees;<span lang="EN-US" style='background: white; color: rgb(34, 34, 34); font-family: "Arial","sans-serif"; font-size: 10.5pt; mso-bidi-font-size: 11.0pt; mso-fareast-font-family: 宋体; mso-fareast-theme-font: minor-fareast; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;'>Use features: the building is (...)

6 Pancras Square

​BNP Paribas Real Estate presents 6 Pancras Square next to Saint Pancras station. The building was designed by Jean-Michel Wilmotte and will be developed by BNP Paribas Real Estate Property Development UK.The project comprises of offi (...)


  • Published on 11 June 19
    by Julien Wortrai|France
    Viewed 487 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Users' Choice


    The energy consumption of this building is one of its remarkable features. This level of performance is allowed in particular by:

    • the presence of photovoltaic panels and solar thermal tubes
    • equipment in LED luminaires
    • Evolutionary GTB based on a BACnet / IP protocol to adapt the supply of fresh air, hot / cold air and light to the needs of the building
    • as well as a balance between the proportion of windows and piers

    Certification Scheme


    Location

    6-8-10 rue Henri Sainte Claire Deville , 92500 Rueil Malmaison France

    Technicals Features