Municipal Technical Center - La Roche Sur Yon

  • Project type : New Construction
  • Building Type : Factories
  • Construction Year : 2014
  • Delivery year : 2015
  • Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
  • Net Floor Area : 1 270 m2
  • Construction/refurbishment cost : 823 819 €
  • Number of Installed Kw : 12 Installed Kw


Moderated by : C21 France La redaction

Similar case studies

Eco Village 2 Jules Verne

Located at the entrance of Amiens along main roads leading to Paris, Lille, Beauvais, Reims, Rouen, Le Havre, or Belgium and Germany, Amiens CCI offers the eco-village Jules Verne 2. This is a set of 3,000 square meters of workshops (...)

Eco-construction of the bioclimatic wooden building at the Aubevoye wastewater treatment plant

The entire Aubevoye wastewater treatment plant responds to an innovative HQE® approach, proposing a bioclimatic timber frame construction building made of Douglas fir class 4, combined with natural and high-performance materials, enab (...)

IXblue, the industrial building for satellites

In accordance with the projected schedule, GA Smart Building delivered at the end of July 2015 a new tertiary building with laboratories on the Technopole Microtechnique & Scientifique TEMIS in Besançon, on behalf of AKTYA (real estat (...)


  • Published on 17 April 18
    by Tugdual ALLAIN|France
    Viewed 1717 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    • Energy = The building complies with the Passivhaus standard with heating requirements of 8kWh / m².year and total primary energy consumption of 92 kWhEP / m².year, all with a construction price of 800 € / m² (excluding process), lower than the initial budget of the customer who wanted a building compliant with the French regulatory standard. The overall cost of the project is really optimized and the operating and maintenance costs are very low given the simplification of systems.
    • Comfort = Compared to the initial demand of a standard building, the gain in comfort is very important because there is no thermal obligation to isolate an industrial building simply maintained at 12 ° C. With the passive design, all the walls are insulated to guarantee a U performance.

    Certification Scheme


    Location

    , 85000 La Roche Sur Yon France

    Technicals Features