New Construction
- Building Type : Office building < 28m
- Construction Year : 2010
- Delivery year : 2010
- Address 1 - street : 5 rue Jean Marie Lhoste 64300 ORTHEZ, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 1 762 m2
- Construction/refurbishment cost : 3 800 000 €
- Number of Work station : 70 Work station
- Cost/m2 : 2156.64 €/m2
-
Primary energy need
35.4 kWhep/m2.an
(Calculation method : RT 2005 )
Built by the General Council of Pyrenees-Atlantiques, delivered in late 2010 and commissioning in early 2011, it includes all the institutional partners of the social action of Orthez.Ce 1761 m2 building, which houses seventy agents, is certified High Environmental Quality (HQE) NF tertiary buildings for all three phases (program, design and construction), ranked "outstanding" HQE and the international passport has been awarded the Low Energy Building, the 2005 level Effinergie BBC 12/01/2012.
Sustainable development approach of the project owner
HQE certified building referential label in 2010 with BBC effinergie 2005. Passport International Green Building ranked "outstanding" awards by CERTIVEAArchitectural description
Bioclimatic architecture orientated north-south, protected from prevailing winds.Building users opinion
Very satisfied, this is another way to live in a building desktop. Very comfortable to use, for illumination and heating.The comfort of a summer is improving despite the GTB, comfort ventilation, and the Canadian well surventilation night.Indeed, this is a building with a very good performance of the air tightness 0.7, this performance also works the other way and any excess heat in the building in summer has trouble being evacuated.
If you had to do it again?
We will remake the same with even listen, the same team and the same ambitions.
See more details about this project
https://plus.google.com/photos/106791329097613913996/albums/5688207457993885073Stakeholders
Contractor
CONSEIL GENERAL DES PYRENEES ATLANTIQUES
DAEE - Service Bâtiment - 05.59.11.44.93
http://www.cg64.frConstruction Manager
Gauche's Muru - Architectes
M. Xavier GAUCHE
http://www.architectes-gauchemuru.fr/default.aspxConstruction Manager
CLIMELEC
M. MAISONNAVE
http://www.yelp.fr/biz/climelec-angletConstruction Manager
NOBATEK
M. GUILLIORIT
http://www.nobatek.com/Assistance to the Contracting Authority
INDDIGO
Mme FAUCONNEAU
http://www.inddigo.com/Certification company
CERTIVEA
Mme DEVELEY - 01 40 50 29 09
http://www.certivea.fr/homeContracting method
Separate batches
Type of market
Global performance contract
Energy consumption
- 35,40 kWhep/m2.an
- 76,18 kWhep/m2.an
Real final energy consumption
35,40 kWhef/m2.an
Envelope performance
- 0,47 W.m-2.K-1
- 0,70
- 0,70
More information
GREENHOUSE GAS 2.91 0.59 KgeqCO2/m2/an LIGHTING, HEATING 2.05; COOLING 0.02; In ECS + Elec. 0.01; AUXILIARY - WIND. 0.24
Systems
- Condensing gas boiler
- Water radiator
- No domestic hot water system
- Others
- Nocturnal Over ventilation
- Double flow heat exchanger
- Solar photovoltaic
- Other, specify
- 3,00 %
Smart Building
Urban environment
- 3 695,00 m2
- 25,00 %
Product
Heating and cooling by the Canadian well with central dual stream, lighting autogradable to detection of presence, GTB
HELIOS, PHILIPS, EES
HVAC, électricité / ventilation, cooling
Several systems in place: - Well with Canada's central turbofan - autogradable lighting with presence detection of wall-Plant-GTB performance
Well Canada can receive a small difference between 10Â ° C outside temperature and that of the well (recuperationn summer and winter). The temperature of the building is very stable which can generate discomfort in summer when it's 24a ° C was hiring in the building. The GTB is a valuable tool but need the expertise in its use for construction and operation.
Water management
- 70,00 m3
Indoor Air quality
GHG emissions
- 2,91 KgCO2/m2/an
- 30,00 année(s)
- 90,00 KgCO2 /m2