Lotissement du Canal

  • Project type : New Construction
  • Building Type : Terraced Individual housing
  • Construction Year : 2015
  • Delivery year : 2015
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 582 m2
  • Construction/refurbishment cost : 671 000 €
  • Number of Dwelling : 6 Dwelling
  • Cost/m2 : 1 153 €/m2
  • Cost/Dwelling : 111 833 €/Dwelling


Moderated by : Construction21 Communication

Similar case studies

Passivistas:TheHouseProject

The existing building, a typical 1960´s Athens single-family house, was selected for a full refurbishment using Passivhaus standards. The bearing structure was originally made by reinforced concrete with no insulation in the walls (...)

Cité des Cheminots in Forbach

The residence is the result of the demolition of 40 rental apartments and social reconstruction of 23 terraced houses.

"Les Charmilles" residence

· Building certified BBC Effinergie The operation “Les Charmilles” with twenty-eight housings in the town of Jouques is the first BBC operation by the social landlord Famille & Provence as contractor. The design of this project was (...)


Testimonials


Comments


  • Published on 30 June 16
    by Jean-Loup LEMIRE|France
    Viewed 3779 times


  • Contest

    Green Building Solutions Awards 2016

    Energy & Temperate Climates
    Users' Choice Award


    ​The project concerns the construction of a settlement area for the Travelling Community. This social project provides accommodation for six families from the Travelling Community. The high concept is to propose a settlement area for people who are usually nomads.
    Thus, this experimental project organizes housing modules can be autonomous but does not seek to replace the caravans. They offer minimal accommodation that is complemented by the proposed project.

    Certification Scheme


    Location

    Chemin de la Grande Plaine , 42450 Sury le Comtal France

    Technicals Features