Les Amarantes

5791
Last modified by the author on 17/10/2014 - 17:23

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2014
  • Delivery year : 2014
  • Address 1 - street : Rue Françoise d'Eaubonne 31000 TOULOUSE, France
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.

  • Net Floor Area : 3 116 m2
  • Construction/refurbishment cost : 6 000 000 €
  • Number of Work station : 223 Work station
  • Cost/m2 : 1925.55 €/m2

Proposed by :

Certifications :

  • Primary energy need
    97.2 kWhep/m2.an
    (Calculation method : RT 2012 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

IN the center of the Borderouge neigborhood, located in the north of Toulouse, Les amarantes offer 9.200m² of offices in three buildings: the Carmin, the Vermeil and the Sienne. These three entirely modular and partitionable buildings leave all latitude when it comes to setting up work spaces. They feature high quality prestations for an optimal comfort of usage.

PLanned surface: 9.200m²
First delivery on march 2014 (2.895m²)

Sustainable development approach of the project owner

The operation Les Amarantes aims for the NF-Tertiary Building certification-HQE approach. The first delivered building is certified and obtained the Sustainable Building Passport "Very Good".
Performances are based on the Gapéo® technology, an intelligent energy management system developed by the GA group. This ensures a global solution to energy management while allowing individualized control of each office equipment. The building has a contractual commitment on energy consumption under 35 kWh/m²/ year for heating, cooling and ventilation.

Architectural description

Fully adjustable and partitionable, the three buildings leave discretion in setting of workspaces. They feature high-end services for maximum user comfort.

See more details about this project

 http://www.ga-sa.fr/adminga/assets/docs/Les_Amarantes.pdf

Stakeholders

    Contractor

    GA Promotion

    8, chemin de la Terrasse BP 95809 31505 TOULOUSE Cedex 5

     http://www.ga-sa.fr/

    Construction company

    GA Entreprise

    8, chemin de la Terrasse BP 95809 31505 TOULOUSE Cedex 5

     http://www.ga-sa.fr/

    Designer

    Gabriel et Michèle DE HOYM DE MARIEN SARL et CDA Architectes


Contracting method

General Contractor

Type of market

Realization

Energy consumption

  • 97,20 kWhep/m2.an
  • 140,00 kWhep/m2.an
  • RT 2012

    RT2012 consumptions kWhep /m²/ year
    - Heating: 25.9
    - Cooling: 14.6
    - Hot water system: 6.2
    - Lighting: 24.7
    - Auxiliary: 0.6
    - Ventilation: 8.6

Envelope performance

  • 0,64 W.m-2.K-1

Systems

    • Heat pump
    • Fan coil
    • Other hot water system
    • Reversible heat pump
    • Fan coil
    • Double flow heat exchanger
    • No renewable energy systems

Smart Building

    GAPEO

Urban environment

  • 9 888,00 m2
  • 4 035,00
  • Les Amarantes are located in Toulouse, facing the second main square of Toulouse after the Capitol, in the heart of a neighborhood undergoing a revival. An ideal location, close to all major access roads serving the Metropole:
    - Metro: Borderouge Station (Line B)
    - Bus: Served by 8 lines
    - Velo 2 stations
    - Train: Toulouse Matabiau railstation is only 10 minutes away by metro or car
    - Ring road: At the exit of the exchanger Urban Boulevard North
    - Airport: 15 minutes from Toulouse-Blagnac airport

Product

    LEIGA STRUCTURE

    GA

    8 chemin de la Terrasse BP 95809 - 31505 Toulouse Cedex 5

     http://www.ga-sa.fr/

    Structural work / Structure - Masonry - Facade

    Patented system poles / beams: Slabs prestressed beams + + Posts

    The concrete structure of the building is prefabricated in the factory.Construction advantages: - respect for delays and mastery of quality, - reduction of nuisance and pollution (few buckets of wash water has concrete, inert waste reduction ...) ...Strengths for offices layouts: the framework allows for very large litters, giving vast plateaus and can be freely feeders and change function cheaply throughout the service life of the building.


    Technical Facilities embedded in walls

    GA

    GA

     http://www.ga-sa.fr/

    Structural work / Structure - Masonry - Facade

    Monobloc air treatment devices are integrated into the facade offering optimal modularity premises. The concrete facade is prefabricated in the factory and presents the specific reservations for the integration of devices.

    The units provide heating, cooling and hygienic ventilation functions via technical solutions assembled in the factory in one and the same container. In addition to the native performance of the equipment, such a system is effective particularly in terms of reduction of distribution losses, since it requires no hydraulic or aeraulic network.

    The devices are managed by a centralized technical management system developed by the GA group: Gapéo®. GTC makes it possible to harmonize the management and to the monitor energy consumption.

    Furthermore, the individuality of the devices guarantees a high level of customer comfort for users, who can control their local thermal environment in space.

Construction and exploitation costs

  • 6 000 000

Water management

  • 622,00 m3
  • The annual water consumption from the water system is only about the drinking water consumed in bathrooms. It is theoritically calculated onscenarios frequency for bathrooms and on the characteristics of installed equipment. These were selected for their sobriety in water consumption.

Indoor Air quality

    The choice of products and building materials was made to select the more environmentally friendly ones, particularly in terms of emission of VOCs. The A Class , according to regulatory, labeling, has been requested for products and materials in contact with the inside air.

GHG emissions

  • 3,09 KgCO2/m2/an
  • This results shows the pollution caused by the energy consumption of the building, calculated according to RT2012