Monet
New Construction
- Building Type : Office building < 28m
- Construction Year : 2014
- Delivery year : 2015
- Address 1 - street : 265 Avenue du président Wilson 93310 SAINT DENIS, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 20 600 m2
- Construction/refurbishment cost : 41 260 000 €
- Number of Work station : 1 600 Work station
- Cost/m2 : 2002.91 €/m2
-
Primary energy need
81 kWhep/m2.an
(Calculation method : RT 2005 )
Developed under real state promotion contract by Nacarat, this set of 20 600 m² of offices divided into four buildings, will host all future services of the SNCF, with capacity for 1600 people.
Designed by the Agency Devillers & Associates and built by Rabot Dutilleul Construction as general contractor, the Monet not only offers spacious and comfortable workspaces around a patio. The program, located in the new business district of Landy, is also fully engaged in urban renewal policy of “La Plaine Saint Denis” and the requalification of the former site of GDF gas plants. Certified Non-residential building under construction- HQE® and Low energy consumption building (BBC Effinergie), it contributes to the energy transition of its territory, as illustrated by the rooftop installation of 595 m² of photovoltaic panels. This "fifth facade" should allow an annual production of 70,000 kWh, redistributed on the public network. A first for Nacarat!
Sustainable development approach of the project owner
A pioneer in the field of eco-design, Nacarat is engaged in a process of social and environmental responsibility, based on ISO 26000 reference. This commitment is definitely illustrated by high environmental and social value-added operations such as Monet . Project stakeholders, MOE, advice, business, were up to the high ambitions of the project yet. The stress. Anxious to anticipate the regulations on energy efficiency, Nacarat designed this project, responding to BBC standards even before the office repository is established. Certified NF tertiary buildings - HQE®, Monet focuses on controlling consumption thanks to increased external insulation. In order to obtain the label Effinergie® BBC, which embodies the reduction of more than 50% of energy consumption reference RT 2005, Monet welcomes 595 m2 of photovoltaic panels on the roof. Annual production is estimated at 70,000 kWh, this electricity is distributed to the public network. https://www.youtube.com/watch?v=Am8pMwrfLW4&index=2&list=PLiM804js2Bd51petLU3FV79ccyRUo8Fv3Architectural description
A modular project where transparency and vegetation coexist:- We imagined an exceptional building by its flexibility. When the SNCF spoke about their interest, we could easily reshape the project to the specific needs of the company, including creating a second input and adding modular meeting rooms. The objective is to think the building over the long term.
- In addition, Monet consists of four buildings open on all four facades, connected by transparent bridges and the center of which extends a patio. The project provides a large place to vegetation; the terraces, roofs and patio will be widely planted promoting rainwater retention and creating an ecosystem pleasant to work.
https://www.youtube.com/watch?v=ldSv9kHkRXM&feature=youtu.be&list=PLiM804js2Bd51petLU3FV79ccyRUo8Fv3
Building users opinion
Not yet occupied (in September 2015).
If you had to do it again?
Complex project but very well executed: it is a great pride for Nacarat and Rabot Dutilleul Construction. We were referring to the same thing. Maybe taking into account the interest of the territory for the circular economy, integrating waste recycling in concrete by example ... to follow in other projects.
See more details about this project
http://www.leparisien.fr/saint-denis-93200/saint-denis-un-nouvel-immeuble-ecolo-livre-a-la-sncf-au-landy-23-06-2015-4886125.php#xtref=https%3A%2F%2Fwww.google.fr%2Fhttps://www.construction21.org/france/data/sources/users/4713/intervenants-a-lacte-de-construire.docx
Stakeholders
Contractor
Nacarat
Sophie Galmard
http://corporate.nacarat.com/fr/corporate/realisations/detailcorporate/4/saint-denis-le-monet.htmlDeveloper
Company
Rabot Dutilleul Construction
Marc Sanoner
http://www.rabotdutilleulconstruction.com/Green construction site at TP HQE
Designer
Christian Devillers Architecte
Christian Devillers
http://www.agencedevillers.com/Great architect
Other consultancy agency
TERAO
Anne-Cecile Ledanois
http://www.terao.fr/AMO Eco Construction
Contracting method
Other methods
Energy consumption
- 81,00 kWhep/m2.an
- 99,00 kWhep/m2.an
Envelope performance
- 0,79 W.m-2.K-1
- 1,38
Systems
- Urban network
- Radiant ceiling
- Fan coil
- Urban network
- Urban network
- Fan coil
- Double flow heat exchanger
- Solar photovoltaic
- 10,00 %
Urban environment
- 7 182,00 m2
- 80,00 %
- 1 526,00
Product
Photovoltaic Module PW6-BIPV1

Photowatt
Resp Commercial
http://www.photowatt.com/panneaux-solaires/panneaux-photovoltaiques-rendement/fabricants-panneaux-solaires.htmlManagement / Others
Integrated photovoltaic module to the frame.
RAS
Modelpak 82-58

modelsystemitalia
Resp Commercial
http://www.modelsystemitalia.it/fr/produits/stores_venitiens/stores_venitiens_exterieur/Modelpak_82_58/Structural work / Passive system
The blinds Modelpak® 82 and 58 to metal blades are characterized by a desired profile, curved and designed to allow optimum levels of concealment and precise metering of daylight indoors.
No particular problem
Construction and exploitation costs
- 4 300 000 €
- 52 840 000 €
Indoor Air quality
Comfort
GHG emissions
- 10,00 KgCO2/m2/an
Life Cycle Analysis
Reasons for participating in the competition(s)
Energies Renouvelables : 70000 Kwh/an de production électrique en Photovoltaïque
Zéro énergie : 20 000m² certifié BBC Révov
Santé confort : Certification HQE avec une attention toute particulière de l'architecte Christian Devillers sur le sujet confort/Santé
Troisième révolution industrielle:
- Energie renouvelable
- Efficacité énergétique