L6, The Energy and Positive Water Laboratory

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2018
  • Delivery year : 2018
  • Climate zone : [Dfb] Humid Continental Mild Summer, Wet All Year
  • Net Floor Area : 5 913 m2
  • Construction/refurbishment cost : 20 000 000 €
  • Number of Work station : 120 Work station


Moderated by : C21 France La redaction

Similar case studies

ADEMI-DF

​An office building, designed for ADEMI-DF's new headquarters (Association of Real Estate Market Companies of Brazil Federal District). ADEMI-DF was opened on december 2015. This project, with sustainable solutions, has 733m2 of built (...)

CLT multicomfort office building

In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office (...)

VELUX China Headquarters

VELUX Langfang Office is the headquarters of VELUX China. Located in the Hebei province, around 45 kilometers from Beijing, the building houses management, marketing and the technical department and sales division.The two-storey build (...)


  • Published on 13 June 18
    by Jérémy GARCIA|France
    Viewed 3811 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    Global project

    - Architectural project chosen "compact" to limit soil sealing, and integrating biodiversity

    - HQE programming / design Exceptional level

    - BEPOS out of process pilot approach (Certivea & Effinergie)

    - Experimental approach E + C- (winner call for project ADEME 2018)

    - Construction in 3D BIM model

    - Consumption monitoring by GTB

    Energy / CO2

    - DHW and Heating by the Heat Network

    - Canadian well: Pre-heat or pre-cool outdoor air depending on the season

    - Recuperation of calories from CTA air extraction to pre-heat air entering the building

    - Cooling unit with HFO R1234ze fluid (very low heating capacity)

    - Energy production: 1500m2 photovoltaic panels

    - COBIAX dimpled slab structure: recycled plastic balls are placed between the reinforcements before pouring the slab for more lightness (- ~ 1/3 need concrete, therefore less CO2 emitter)

    - Lift with energy recovery

    - High performance glazing (argon blade)

    Water

    - Recovery of rainwater for sanitary purposes

    - Treatment of activity water by system of filter basins (Phytorestore)

    - Reuse of treated waters for supplementary health food (Laureate France Experimentation, exchanges with the Regional Agency for Health)

    - Parking water treated by a system of hydrocarbon pool

    - Mutualization of two hydraulic structures on the same plot to collect rainwater: creation of a silky canal planted with phragmites, and a landscaped valley of various floristic species (iris, rush, willow ...)

    biodiversity

    - Non-transparent glazing: to limit bird collisions, Refuge LPO site

    - Treatment of water by phytoremediation: presence of many plants, and a basin in water: place of reproduction of odonates

    - External fence with coarse mesh to allow the passage of micro / macro-mammals in limit of departmental green flow

    - Creation of a recirculating water basin, after the treatment of road water: second water point to allow the development of amphibians

    - Mustard planting pending the planting of a "wood edge": home of insects and birds

    - Choice of hotels with natural insects: pile of wood

    - Biophilia concept: view of landscaped areas from workstations and plants inside the building

    Territorial anchorage

    - 8000h of social insertion

    - Use Heat Network of the municipality of Chevilly-Larue

    - Participation in the financing of the fresco sustainable development on the green flow

    - Closing "open" on the outside for biodiversity

    Mobility

    - 60 new spaces including 6 electric covered by photovoltaic shadows

    - new bike parking


    Certification Scheme


    Location

    188 Rue Paul Hochart , 94550 Chevilly-Larue France

    Technicals Features