Kindergarten School of Vasteville

  • Project type : New Construction
  • Building Type : School, college, university
  • Construction Year : 2015
  • Delivery year : 2016
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 870 m2
  • Construction/refurbishment cost : 1 440 215 €
  • Number of Pupil : 125 Pupil


Moderated by : C21 France La redaction

Similar case studies

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)

RENOVATION OF THE SCHOOL GYM – MIDDLE SCHOOL “DANTE ALIGHIERI”

In the Mediterranean climate, through careful design based on sustainable bioclimatic study of the site, marked by the simple construction of the dry assembly, the project of renovation of an existing gymnasium obtains high performanc (...)

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)


  • Published on 26 January 18
    by Joël LERICHE|France
    Viewed 3283 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Health & Comfort
    Users' Choice



    Certification Scheme


    Location

    7 Rue Jacques Prévert , 50440 Vasteville France

    Technicals Features