Headquarters of the CAUE (Architecture and Urban Planning Council) in Gironde

  • Project type : Renovation
  • Building Type : Office building < 28m
  • Construction Year : 2018
  • Delivery year : 2018
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 960 m2
  • Construction/refurbishment cost : 1 781 000 €
  • Number of Work station : 33 Work station
  • Cost/m2 : 1 855 €/m2
  • Cost/Work station : 53 970 €/Work station


Moderated by : Hassan ABOUZID

Similar case studies

Almelo City Hall

​As part of a larger plan to revitalise the city centre of Almelo, the newly built city hall is an example of sustainable construction and modern design. With sustainability as the cornerstone of its design, the building is currently (...)

Studio Bruno Stagno Architect

The building is located in a neighborhood of San José, Costa Rica, whose buildings date back to the second half of the 20th century.The vast majority of them are houses, but some of them have been transformed into shops and offices (...)

My Republic Plaza (Green Office Park 6)

​My Republic Plaza (Green Office Park6) is located in foot print area amounted 12,890 m2 has five floors for work space and basement. It also becomes one of part in Green Office Park BSD City which built base on Green Building Concept (...)


  • Published on 22 May 19
    by Elodie Vouillon|France
    Viewed 1261 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Users' Choice


    After a first year of operation, we find low energy consumption levels coupled with real thermal comfort.
    The favorable temperature difference brought by the bioclimatic greenhouse limits thermal losses in winter and preserves a cooler atmosphere than outside in summer.


    Certification Scheme


    Location

    293 rue d'Ornano , 33000 Bordeaux France

    Technicals Features