Gabrielle Residence
Renovation
- Building Type : Collective housing < 50m
- Construction Year : 1972
- Delivery year : 2020
- Address 1 - street : 9 rue de la Ferronnerie 78380 PLAISIR, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 21 271 m2
- Construction/refurbishment cost : 4 207 000 €
- Number of Dwelling : 265 Dwelling
- Cost/m2 : 197.78 €/m2
Certifications :
-
Primary energy need
92 kWhep/m2.an
(Calculation method : RT existant )
The Gabrielle residence is located in Plaisir in the center of the town, on the Prieuré estate, formerly occupied by a Benedictine community. Composed of 13 small buildings, not exceeding 5 levels on the ground floor, these small buildings are scattered among islands of greenery so as to benefit from the best sunshine and the best view of the park, the river and the church. .
The state of the facades having deteriorated over time and the maintenance of the balcony railings requiring a binding annual maintenance, the condominium decided to launch renovation studies.
The Syndical Council chose the REANOVA company which was commissioned to carry out:
- An energy audit in 2016 including proposals for different work scenarios;
- A design mission with financial support voted at the General Assembly in January 2017
- The vote of the works in 2018 for a period of 24 months.
Following the completion of the audit, the condominium therefore embarked on a complete renovation program including:
- the insulation of facades from the outside;
- replacement of hall doors;
- the replacement of the original private joinery;
- insulation of roller shutter boxes;
- replacement of rolling shutters (individual option);
- insulation of flat roofs and security;
- replacement of skydomes;
- the implementation of a type B hygro-adjustable CMV;
- installation of automatic purge valves;
- balancing the heating and domestic hot water network.
Building users opinion
The general opinion of the condominium is very satisfactory. The co-owners find the residence very pretty, that the project as a whole is a success and they observe a capital gain when reselling the apartments.
If you had to do it again?
The Gabrielle residence project encountered a major problem: the widespread presence of asbestos in the residence (concrete facades and coating, glasal window sills). From the start of the project, it was necessary to adapt to this constraint and find architectural and technical solutions in order to stay within reasonable budgets for the condominium.
See more details about this project
https://www.reanova.fr/copropriete/residence-gabrielle-78370-plaisir/https://www.construction21.org/france/articles/h/green-solutions-un-exemple-de-renovation-globale-et-performante-la-residence-gabrielle.html?n=20230510085741
Photo credit
Reanova
Contractor
Construction Manager
Stakeholders
Company
SOCATEB
Monsieur Valente
https://socateb.com/Facades and waterproofing package
Company
NORBA MENUISERIES
https://www.norba-menuiserie.com/Joinery lot
Company
AIRTEC
Lot ventilation
Company
GESTEN
Heating package
Contracting method
Separate batches
Type of market
Global performance contract
Energy consumption
- 92,00 kWhep/m2.an
- 161,91 kWhep/m2.an
Envelope performance
- 0,99 W.m-2.K-1
More information
The energy label of the building does not correspond to the primary energy consumption indicated because two distinct calculation methods were used respectively for the consumptions and the label.
Systems
- Gas boiler
- Water radiator
- Gas boiler
- No cooling system
- Humidity sensitive Air Handling Unit (Hygro B
- No renewable energy systems
Urban environment
Construction and exploitation costs
- 2 000 000 €
GHG emissions
- 37,00 KgCO2/m2/an
Reasons for participating in the competition(s)
La résidence Gabrielle est un exemple de rénovation globale exemplaire.
En effet, suite à une étude technique approfondie, l'ensemble des copropriétaires ont pu voté un programme de travaux complet permettant de palier des déperditions thermiques importantes. Cette rénovation a permis d'atteindre un gain énergétique important et une valorisation architecturale, tout en respectant les délais et les budgets annoncés.
Building candidate in the category