Eco-Renovation headquarters of KTR France
Renovation
- Building Type : Office building < 28m
- Construction Year : 1970
- Delivery year : 2018
- Address 1 - street : 5 Chemin de la Brocardière 69570 DARDILLY, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 854 m2
- Construction/refurbishment cost : 1 500 000 €
- Number of Work station : 40 Work station
- Cost/m2 : 1756.44 €/m2
-
Primary energy need
67 kWhep/m2.an
(Calculation method : RT existant )
In 2017, KTR acquired a 70s building in western Lyon to transfer its head office in France. Diagonale Concept proposes to KTR France to carry out an exemplary eco-renovation in line with the group's values and image.
At the beginning of 2017, Marc Campesi, head of Diagonale Concept, proposes to Pierre Martin, France Director of KTR, to select 7 priority objectives:
- A first tertiary renovation with positive energy and more: Make an uncomfortable building of the 70s, a building that produces more energy than it consumes and tends towards energy autonomy. It is not always easy to insulate and quench a building under renovation. Assuming there is a limit to reducing consumption without reducing comfort (eg reduce openings), the idea of the project was to benefit from a maximum of free renewable energy to offset losses.
The building is equipped with a process that stores solar thermal energy in the rock at 150 m depth via a battery of 4 probes. It is a producer of electrical energy thanks to a photovoltaic power station, part of which is in the process of self-consumption. The self-consumption PV panels ensure, as a priority, the operation of the thermal process (supply of the pumps), supply a storage battery (no more power failure and inverter) and charging sockets for electric vehicles. Some figures: Production 42MWh / Consumption 26 MWh (values estimated regulatory uses by fluids BET in year N + 2). The set is equipped with a monitoring. The first figures consolidate the estimates. All purpose, the building remains positive.
- A low carbon approach: The use of biobased or recycled (and / or recyclable) materials guided the choice of products implemented as well as the life cycle analysis (LCA). French hemp and cork for insulation, products from recycling on the ground, exterior wood joinery, cladding made from compressed Kraft or reconstituted wood. And of course a positive energy building with self-consumption. Local businesses for limited travel.
- An intelligent building connected to the service of user comfort and quality of use. With my smartphone, I have access to all shutter closing functions, external gates, security systems ... The building performances are displayed live (positive energy, autonomy, co2). The building is equipped with a GTB that tracks the information of nearly 80 sensors.
-Quality of life at work and sanitary quality: Ensure that this building is pleasant to live and that it contributes to the wellbeing and the health of users. The facilities were the subject of prior consultation with users with the intervention of an ergonomist. Each workstation is equipped with an electric desk to alternate between standing and sitting (blood circulation). The building is largely glazed (+ 20% compared to the building reference system RT2012), it is bright. The interior views were neat, and the planted workspaces including some acoustic panels. Artificial lighting partly self-dimming according to daylight. The sanitary quality of the frame has been studied with care until the door handles of the toilets which are bactericidal. A consultant air quality and sanitary quality accompanied the companies during the works for the choice of materials without VOC and the systems of air treatment. Indoor air quality monitoring was set up for 2 months after reception. CO2 and hygrometry in the premises are monitored daily with a display per room. In summer, the building is not air conditioned but equipped with a cooling floor connected to the geothermal probes. With the accompaniment of a facilitator, the kitchen gardens contribute to the good living together as the picking of the first fruits and vegetables from the garden and fruit trees planted in the spring of 2018 ...
Sustainable development approach of the project owner
The aim was to create a building that reflects our company and its values: an innovative building with excellent working conditions for our employees. KTR is an independent company that does not depend on financial groups, the new building should also tend towards a form of autonomy particularly energy plan.
The group has already built high-performance buildings in Germany and Europe, particularly from an energy point of view. The idea was to renovate the Dardilly building with a high level of energy performance and a comfortable and ergonomic work environment for our employees and customers. Marc Campesi of Diagonale Concept has proposed to go further and to integrate a more global eco-responsible dimension to the project while involving the employees of the company. The final result is very satisfactory, the renovation was completed in less than 11 months with a very positive dynamic on the site. The building has become a reference in the KTR group. Careful detailing and finishing were particularly appreciated during the inauguration of the building in the presence of the leaders of the group and all the world directorates.
Architectural description
The desire to integrate the building in a very gentle way in the landscape has naturally imposed itself from the design. As a renovation work on the envelope and landscaping allowed us to melt the building in its environment by combining mineral and vegetable in the building elements. The bioclimatic design guided the work on the envelope especially the free inputs via large windows in the South and West. The presence of awning to the south (terrace) and to the west (photovoltaic panels) is complemented by sun breezes that punctuate the façade and protect the occupants from summer overheating. . The removal of bitumen from the car park, the vegetal reinforcement on the exteriors and the roofs will contribute to the thermal comfort in summer. The all-season comfort is reinforced by the quality of biosourced insulation and cladding that contribute to the thermal phase shift and hygro-regulation. In terms of spatial organization, the initial consultation work conducted with the users made it possible to respond to collective and individual expectations.
Building users opinion
After the break-in and adaptation phase to change of site and organization of workstations, the level of satisfaction is very good. A consultation work 2 months after integration has revealed corrective actions to be conducted including the desired individual control of Led pavers. Some LED luminaires are to be replaced because they are considered too dazzling despite a UGr <19.
Humidity sensors and occupants reported high humidity in the morning. This hygrometry is due to a late morning start of the central dual flow of air treatment to reduce electrical consumption and probably wastewater site. This moisture supply of building materials (screeds etc ..) will be evacuated within a few months
For the rest not back since the activation of home automation and handling systems.
If you had to do it again?
The constraint of passage of the networks must be well evaluated in renovation. Theoretical plots are not always simple to implement. The connected building component is complex with a multitude of communication protocols, closed systems and businesses that have had trouble communicating with the digital world and GTB or home automation. If it were to be redone, it would be necessary to reinforce the work of consultation upstream between the integrators of the GTB, the companies, the industrialists and the users.
See more details about this project

Contractor
Construction Manager
Stakeholders
Designer
Ressources green Building (Ingénieur bâtiment et architecte d'intérieur) Marc Campesi & Sophie Sturlese
Marc Campesi tel 06 33 04 18 04 [email protected]
Programming, technical and architectural study, space design
Thermal consultancy agency
Amstein et Walthert
Corentin Maucoronel Tel. 06 20 91 22 79, [email protected]
http://www.amstein-walthert.ch/fr/Fluid study, thermal and air quality
Company
Terre et Lac
Thierry Franck
Study and installation photovoltaic power plant
Manufacturer
dualsun
Jean Marie Drap +33 6 66 84 70 47 [email protected]
http://dualsun.fr/supply hybrid panels
Manufacturer
Biofib
Olivier Merle 0619300417 [email protected]
http://www.biofib.comsupply hemp insulation
Manufacturer
Mapei
CORALIE DUCHER T. 06 75 94 51 09 email [email protected]
http://www.mapei.com/FR-FR/supply floor resin / air quality group
Manufacturer
Sonepar
Melkonian Gilbert 06 82 64 20 46 [email protected]
http://www.sonepar.com/frsupply and advice lighting / home automation / digital
Contracting method
General Contractor
Type of market
Realization
Energy consumption
- 67,00 kWhep/m2.an
- 221,00 kWhep/m2.an
- 363,00 kWhep/m2.an
Real final energy consumption
38,00 kWhef/m2.an
4,00 kWhef/m2.an
2 019
Envelope performance
- 1,31
More information
Calculation method: IDA 6 ICE dynamic thermal simulation of EQUAA (Sweden) method CEN 13791 / IDA-ICE has been validated on the IEA Task 12 BESTEST envelope, the IEA Task 22 RADTEST and the method CEN 13791. The all-purpose building produces more energy than it consumes. Self-consumption covers most of the day and inter-season needs (without heating or cooling) and open windows (all windows open)
Systems
- Geothermal heat pump
- Low temperature floor heating
- Individual electric boiler
- Geothermal heat pump
- Double flow heat exchanger
- Solar photovoltaic
- Solar Thermal
- Heat Pump on geothermal probes
- Heat pump
- 160,00 %
Smart Building
Urban environment
- 3 450,00 m2
- 980,00 %
Product
hybrid panels

dualsun
Jean Marie Drap +33 6 66 84 70 47 [email protected]
https://dualsun.fr/HVAC, électricité / heating, hot water
Hybrid PV panels and hot water
Water cools the panels and increases the efficiency of the V
Modules SUNPOWER (France)

Terre et lac
Christophe Paris / Terre et lac / [email protected] / tel 06 89 86 07 59
http://www.terreetlac.com/Finishing work / Electrical systems - Low and high current
Output is about 2.5% higher than other multicrystalline modules.
96 Monocrystalline cells Maxeon Gen. II
Product warranty 25 years,
Power Curve: 95% over the first 5 years, -0.4% per year until the year 25 (87% at 25 years)
Updated PV CYCLE membership (recycling of the modules included in the installation - Rousset plant (13))
Construction and exploitation costs
- 170 000,00 €
- 150 000 €
- 1 500 000 €
- 24 000 €
Water management
Indoor Air quality
Comfort
GHG emissions
- 1,00 KgCO2/m2/an
- 11,00 KgCO2 /m2
- 50,00 année(s)
Life Cycle Analysis
Reasons for participating in the competition(s)
Bâtiment résilient
Le bâtiment est adapté à la canicule avec une consommation d'énergie effacée en pleine journée et des émissions de C02 quasiment nulles (voir onglets énergie et carbone). En juin 2019, en pleine canicule l'écart de température entre l'extérieur était de 17°C (40° ext et 23°c intérieur) avec la seule énergie de quelques PV en auto-consommation : voir graphique dans l'annexe énergie.
Les parkings sont perméables à 60% et les toitures végétalisées pour éviter les effets de ruissellement des eaux et saturation des réseaux publics lors d'épisodes de fortes pluies.
Le bâtiment est adapté aux enjeux sanitaires en relation avec la qualité de l'air et au risque de propagation des virus. Pas de climatisation mais des planchers réversibles et une possibilité de ventilation passive. Pas de moquettes, des poignées bactéricides dans les sanitaires et des surfaces lessivables ou sans joints (salle de réunion).
Les potagers avec un animateur en permaculture contribuent à développer l'autonomie des collaborateurs de l'entreprises et le lien social avec un minimum de moyens.
Le concept global est reproductible et le process énergétique mutualisable entre plusieurs bâtiments. Stocker l'énergie solaire (panneaux PV hybrides) et la chaleur fatale * en été dans des sondes géothermiques (X4) relève du bon sens.
*Chaleur fatale : en été, on refroidit les locaux de manière passive en absorbant les calories à l'intérieur du bâtiment via un plancher réversible et en les stockant pour l'hiver dans la roche via des sondes géothermiques."
Le surcoût de rénovation globale avec des aménagements de grande qualité est de 10 à 15% supérieur au prix moyen de marché mais avec des consommations énergétiques effacées et un confort hygro-thermique constaté et mesuré en toute saison par les usagers.
Ce projet est innovant par son approche systémique : il intègre une forte dimension sociale avec une qualité de vie au travail remarquable (qualité de l'air, potager pédagogique, intervention d'une ergonome), c'est un projet économiquement viable qui contribue à l'image de l'entreprise, un bâtiment résilient adapté aux enjeux du XXI siècle et qui a contribué à renforcer la biodiversité locale. Il est décarbonné, à énergie positive (constat par mesure) et intelligent. C'est une rénovation... Sachant que le patrimoine existant est peu adapté à demain. Le bâtiment neuf ne représente que 1% du renouvellement immobilier par an.
Bâtiment à énergie positive avec stockage saisonnier
- Première rénovation tertiaire à énergie positive tous usages, stockage d'énergie thermique solaire et électrique
- Autoconsommation d'énergie photovoltaïque : je consomme sur site l'électricité produite, je charge ma voiture électrique...
- Production 34 MWh en 2019 dont 6 MWh (autoconsommation) / Consommation tous usages 36,6 MWh (facture fournisseur énergie) tous usages dont charge véhicule électrique)
Bas carbone
- En termes de consommations tous usages (réglementaires + bureautique) le bâtiment absorbe plus de CO2 qu'il n'en émet grâce à la production de PV. On parle uniquement de l'exploitation, le cycle de vie des PV et leur impact C0 2 en fabrication n'est pas compris.
- Le recours à des matériaux bio-sourcés ou issus du recyclage (et/ou recyclable) : exemple isolation chanvre et liège.
- Sensibilisation à l'ACV des entreprises et compagnons sur chantier pour limiter les impacts carbone (fabrication et transport) avec un concours organisé pour les industriels sur site.
- Bâtiment à énergie positive uniquement avec des énergies renouvelables (solaires, photovoltaïque, panneaux hybrides solaire PV, sondes géothermiques).
- Entreprises locales
Santé et confort :
- Étude d'ergonomie : bureaux électrique, qualité d'usage, confort des assises, conception concertée avant et après installation
- Mobilité interne des poste de travail par la création d'espaces polyvalents salle de réunion et de pause).
- Démarche qualité de l'air avec formation des entreprises et monitoring des locaux (COV, COVT, CO2, hygrométrie)
- Espaces de travail très vitrés, végétalisés avec des vues extérieures choisies
- Espace de pause soignée et confortables (possibilité de s'allonger) - salle de sport
- Jardins potagers avec formation dans espace extérieur avec une approche de biodiversité positive
Building candidate in the category