Departmental Direction of territories and the sea of ​​Morbihan-Vannes

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2015
  • Delivery year : 2016
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 6 500 m2
  • Construction/refurbishment cost : 9 700 000 €
  • Number of Work station : 200 Work station


Moderated by : C21 France La redaction

Similar case studies

Almelo City Hall

​As part of a larger plan to revitalise the city centre of Almelo, the newly built city hall is an example of sustainable construction and modern design. With sustainability as the cornerstone of its design, the building is currently (...)

CLT multicomfort office building

In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office (...)

My Republic Plaza (Green Office Park 6)

​My Republic Plaza (Green Office Park6) is located in foot print area amounted 12,890 m2 has five floors for work space and basement. It also becomes one of part in Green Office Park BSD City which built base on Green Building Concept (...)


  • Published on 22 May 18
    by Sébastien Prud'homme|France
    Viewed 2760 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Low Carbon
    Users' Choice


    The project's assets for the Low Carbon category are:

    • A level of energy performance confirmed by an energy consumption of 47.6 kWh / m² (SHON RT) / year. This performance is ensured in particular by the implementation of a real passive and bioclimatic design of the building (compactness, adapted solar protection, optimization of natural lighting, natural nocturnal ventilation of offices ...) associated with efficient equipment including 2 wood pellet boilers (2x110 kW) and radiant ceilings for heating.
    • A volume of biobased materials including wood used in the consequent project: 148 dm3 / m² thus this project contributes to the reduction of the carbon footprint. Indeed, the project uses the innovative and patented facade process which is the Mixed Wood Concrete Façade FMB which consists of a wood frame and a prefabricated concrete siding (to reduce the carbon impact and the time of implementation on site) subject to an ATEX (type B) for this project. The FMB façade provides the structural flexibility of the wood and the mineral finish of the concrete. Its assembly is mechanical and realized via SBB connectors. In addition, materials such as hemp or algae-based paints have been used on this project, always in this perspective of low carbon footprint.

    Location

    , 56000 Vannes France

    Technicals Features