Condominium Nice st - Paris 11th
- by Joséphine LEDOUX
- /
- 2019-02-21 10:56:04
- /
- France
- /
- 5351 / FR
Renovation
- Building Type : Collective housing < 50m
- Construction Year : 1893
- Delivery year : 2018
- Address 1 - street : 2 bis rue de Nice 75011 PARIS, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 845 m2
- Construction/refurbishment cost : 303 870 €
- Number of Dwelling : 23 Dwelling
- Cost/m2 : 359.61 €/m2
-
Primary energy need :
301 kWhep/m2.an
(Calculation method : RT existant )
It is a condominium located in the 11th district of Paris and built in 1890.
The condominium, uninsulated and heated by electric heaters, is an energy strainer.
The co-owners therefore wanted to study the feasibility of thermal insulation from the outside .
They first appealed to an architect for a refurbishment project with ITE. The budget announced by the architect seems too important to them, they asked ENERA Council to carry out a study of contradictory Mastery of work .
Our mission focused on the study of the renovation of building facades, to which we recommended to add the insulation of the roof, the insulation of the floors on cellars and the implementation of a hybrid ventilation .
We want to highlight this project to show that a thermal renovation of a condominium building is feasible despite significant constraints:
- Small condominium with a low number of lots (23 apartments - 845m ²) and therefore budgets little diluted (high share by co-owner).
- An old building with a constructive system "porous" and a special attention not to degrade the frame.
- Chilly companies using new materials
- 3 buildings adjoining with a problem of encroachment.
- 70% of landlords.
From a technical point of view, the solution to this project was to propose a fiber - wood insulation on most facades and to propose a hygro A hybrid ventilation in order to ensure air renewal.
We have put in place a progressive communication process to establish the legitimacy of all actors involved and to carry out step-by-step validation. It is this approach of close accompaniment and conductor that has led to a more ambitious project than it was at the beginning for an acceptable cost.
This renovation allowed to go from an energy label G to E.
Consult the map of renovated condominiums on the Paris metropolis
https://paris.coachcopro.com/pages/carte-des-coproprietes-renovees
Sustainable development approach of the project owner
The aim was to combine a need for facade renovation and treatment of wetness problems with efficient energy renovation and the use of bio-sourced materials . The performance of this project, in addition to saving 52% on primary energy , was the project management to succeed despite strong constraints to lead a successful project to the end. Indeed, in the context of a condominium renovation, the difficulty and innovation are not technical strictly speaking. They are found in the communication between the different actors of the project and the technical and social management of the project.
The actors of the project:
The assembly of the co-owners - the union council - the trustee - SOLIHA (the public utility organization accompanying the helpers) - the companies - the neighboring condominiums - the urban planning department of the town hall.
The communication objectives:
- Inform the union council regularly of each advancement with clear and complete information from a financial point of view.
- Validate each step to avoid blockages and backtracking.
- Accompany the company in the handling of new materials (wood fiber) and new techniques of implementation.
- Ensure the proper transmission of information between ENERA Council and SOLIHA and between SOLIHA and the union council / trustee
Communication and project management tools
- Monthly meetings with the union council to indicate progress and allow the SC to make a decision on the next steps.
- 2 meetings of condominiums: 1 presentation of the DCE + 1 presentation in AG to allow an optimal communication around the project. We sent the neighboring condominiums a personalized document explaining the progress of the project and the impacts on their building.
- 2 on-site meetings with the renovation company, the wood fiber manufacturer PAVATEX, the manufacturer of ZOLPAN façade and plaster preparation products in order to fully understand the project and maximize costs.
- Permanences during the construction to answer the interrogations of the occupants.
- Regular communications at each stage of the project.
- A final presentation of the work and the project.
Architectural description
The building dates back to the end of the 19th century and we wanted to respect and maintain the architectural style of the time by producing a plaster of the same color as the existing plaster. The original appearance of the building has been maintained.
If you had to do it again?
The condominium decided to insulate the attic with rock wool while we had proposed an optional cellulose wadding solution whose additional cost did not exceed 1 000 € TTC. Given the assistance that the condominium receives for the use of wood fiber facade, it seemed consistent to continue the process with bio-based materials. The return of joinery will not be treated. To treat the tables, it would have had to remove the shutters installed individually by the co-owners. But the town hall has banned the installation of shutters in case of removal. So, not to lose the use of shutters, it was decided not to isolate the tables. We had 4 months to manage the "study" phase of the project. We would have liked to have more time, to negotiate with the mayor on the shutters and find a solution acceptable to everyone and likewise, have time to convince the co-owners to isolate the attic with cellulose wadding.
See more details about this project
https://paris.coachcopro.com/fiche-de-site/d5be8935-9960-4cfc-a32f-e33cc1c0b614Contractor
Construction Manager
Stakeholders
Company
Europtherm
https://www.europtherm.frNatural ventilation
Company
COULON SA
https://www.coulon-sa.comITE, insulation attics and floors, facade
Contracting method
Separate batches
Type of market
Global performance contract
Energy consumption
- 301,00 kWhep/m2.an
- 234,00 kWhep/m2.an
- 613,00 kWhep/m2.an
Real final energy consumption
116,80 kWhef/m2.an
Envelope performance
- 0,67 W.m-2.K-1
More information
Heating and hot water production being individual it is difficult to obtain the exact consumptions. Nevertheless, by experience, we know that the consumptions including electrical ECS are overvalued by calculation RT ex.
Systems
- Electric radiator
- Other hot water system
- No cooling system
- humidity sensitive Air Handling Unit (hygro A
- No renewable energy systems
Product
DYN ASTATO

ASTATO
Patrick Candela
http://www.astato.comHVAC, électricité / ventilation, cooling
Hybrid statomechanical ventilation allows a natural ventilation draw by venturi effect when the outside temperature or the wind draft permit. When external conditions are not sufficient for natural draft, a motor located under the cap creates the vacuum to provide the necessary low-pressure ventilation flow. This process is particularly suitable for renovation when existing ducts (natural ventilation or old chimney) are difficult to duct. The hygro A low-pressure specific extraction vents allow the ventilation flow to be controlled according to actual needs and occupancy.
This system has been validated without difficulty because it is very suitable for the project and necessary to maintain sufficient air quality after insulation.
GHG emissions
- 16,00 KgCO2/m2/an
- 38,00 KgCO2 /m2
- 300,00 année(s)
Life Cycle Analysis
Reasons for participating in the competition(s)
Le projet s’inscrit dans une démarche de réduction des consommations, de l’impact carbone et d’amélioration du confort. Chauffé par des radiateurs électriques, cette copropriété a isolé son enveloppe et installé un système de ventilation performant. Ces actions ont permis de réduire de 57% les émissions de gaz à effet de serre et d’atteindre un taux de 16kgCO2eq/m².an.
Building candidate in the category

Low Carbon

Users' Choice
Author of the page
Joséphine LEDOUX
Gérante
Other case studies

Thermic renovation of a guard house with baked clay
- 17/03/2023
- /
- Taman Mhoumadi
- /
- 835

Townfield Head Farm
- 13/03/2023
- /
- Mark Woodward
- /
- 762

Public housing in Tarm
- 13/03/2023
- /
- Asta Justesen
- /
- 847

The Danish Nature Agency's official residence in Thy
- 13/03/2023
- /
- Asta Justesen
- /
- 737

Rådhuslunden_City hall grove
- 13/03/2023
- /
- Asta Justesen
- /
- 744

The Phenix
- 13/03/2023
- /
- Lemay
- /
- 669