Cité des Cheminots in Forbach

  • Project type : New Construction
  • Building Type : Terraced Individual housing
  • Construction Year : 2010
  • Delivery year : 0
  • Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
  • Net Floor Area : 2 235 m2
  • Construction/refurbishment cost : 3 420 900 €
  • Number of Dwelling : 23 Dwelling


Moderated by : Véronique Pappe

Similar case studies

Passivistas:TheHouseProject

The existing building, a typical 1960´s Athens single-family house, was selected for a full refurbishment using Passivhaus standards. The bearing structure was originally made by reinforced concrete with no insulation in the walls (...)

86 Copaya

Housing operation that has followed an Ecodom + approach (equivalent to Guyanese THPE) Optimized through ventilation Solar protection of walls and openings reinforced Supply of air blowers in all rooms Significant use of French Guiana (...)

Lotissement du Canal

The project concerns the construction of a settlement area for the Travelling Community.<o:p></o:p>This social project provides accommodation for six families from the Travelling Community. The high concept is to propose a settlement area for (...)


Testimonials


Comments


  • Published on 24 September 12
    by Mathieu LAURENT|France
    Viewed 4967 times


  • Certification Scheme


    Location

    7-13 Rue des Cheminots , 57600 FORBACH France